0:00 Process Oriented Layout
0:52 Introduction to handling cost
3:33 Equation for handling cost
6:08 Problem/Example
6:45 Number of units table
14:24 Problem Conditions
18:10 solution to the problem
20:16 Initial cost calculations
24:17 Minimizing the handling cost
28:42 Minimized handling cost Calculation
▶A machine shop, consisting of 6 distinct production areas is planning to
redesign its layout. The building is 90 feet long and 40 feet wide, with all
production areas of equal size. The material handling equipment being
used can only move clockwise on marked pathways, with loading/
unloading possible only at the center of the production area. The pathways
have only been marked horizontally and vertically and no diagonal
movement of the loads between departments is possible. Management
has estimated that the cost of moving a single load in the facility is $1 for
every 10 feet. Flow matrix between different departments over the last
month and current layout are given.
▶ Design two layouts aimed at reducing the total material handling cost.
In the process layout we try to minimize the handling cost. The cost associated with the handling might be different from one route to another route. To minimize this cost by adjusting the position of each working cell or processes.
Movement of the equipment or the parts from one process to another process is associated with a certain cost. This cost vary from process to process based on the distance between each processes.
Now this is the technique that we use for minimizing the overall cost of the movement from one process to another process.

Опубликовано:

 

7 авг 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 9   
@mohamedantar6865
@mohamedantar6865 Год назад
thank you, that was way helpful to understand the problem if possible make a video of how to automate the process of minimizing the cost (using metaheuristic optimization technique) thanks again you are awesome
@okomefelix160
@okomefelix160 Год назад
Nice one and God bless you richly sir
@technicalpeaks
@technicalpeaks Год назад
Appreciate your support 🌻🌻
@Bilalkhan-pk3lk
@Bilalkhan-pk3lk 4 года назад
Very helpful ..thnxx bro
@technicalpeaks
@technicalpeaks 4 года назад
Thanks for the support..
@khalidnawaz6536
@khalidnawaz6536 3 года назад
I need some clarification about the matix . Can I have your email
@technicalpeaks
@technicalpeaks 3 года назад
Please State your email. I'll contact you as soon as I can. Thanks.
@Nacho-lp5tl
@Nacho-lp5tl Год назад
I can see at least 2 mistakes in the second matrix
@technicalpeaks
@technicalpeaks Год назад
Can you please mention them! I would appreciate it!
Далее
Facility Layout - Operations Sequence Analysis
24:43
Просмотров 94 тыс.
Идея под заказ😂
00:20
Просмотров 301 тыс.
Lecture 21 Facility Layout and Planning-I
33:49
Просмотров 45 тыс.
Inventory Control Technique: ABC Analysis
11:49
Просмотров 115 тыс.
Aggregate Planning Problem
23:24
Просмотров 58 тыс.
Process Selection and Facilities Layout
49:38
Просмотров 34 тыс.