Тёмный

Model Railroad for Beginners - From Loop to Layout - Operating the Yard and Layout 

JC's Riptrack
Подписаться 16 тыс.
Просмотров 24 тыс.
50% 1

**Click on Show More** **Please Like and Share**
The next step in my “From Loop to Layout” series continues from the last video, showing how I integrate the Yard and Industries together into a fully-operational layout. Sure, there's virtually no scenery yet, but this video shows how far we have progressed beyond the basic loop. This video explains the different parts of the layout including the yard, ways to visualize it for operations, and then I run an operations session with my son.
While this is N-Scale, the principles here are transferrable to any scale.
The Micro-Mark Waybill System can be found here:
www.micromark.com/CAR-ROUTING...
And my Waybill Boxes STL files for 3D Printing can be found on Thingiverse for Free:
www.thingiverse.com/thing:474...
(and if you want to see my other 3D Printable objects go here:)
www.thingiverse.com/jcsriptra...
In case you can’t find any of the products I mentioned at your local hobby shop, you can find them on my Amazon storefront:
www.amazon.com/shop/jcsriptrack
Don't worry, I'll still be doing lots of weathering, and more of those videos are already in the pipe, but this series will also help get my layout built!
Follow me on Facebook, Twitter, and Instagram!
/ jcsriptrack
/ jcsriptrack
/ jcs_riptrack
Yes! I do take commissions!
Check out my Patreon page for more details: / jcs_riptrack
I could even feature your model, railcar, or locomotive in an upcoming video!
You can email me at jcsriptrack@gmail.com
If you enjoyed this video, give it a "like" 👍, subscribe 🔔, comment 💬 below, and share it on your social media and model railroad forums.
To learn more about the Products and Equipment Featured or Used in this Video:
Check out my Amazon Store:
www.amazon.com/shop/jcsriptrack
The DCC Control System I use is a Piko Smart Control, which is essentially the same hardware as an ESU Cab Control:
amzn.to/3cqZZPq
Equipment & Software:
Canon HF R800: amzn.to/2XxLfa8
Dji Osmo Mobile 2 (Mobile Phone Gimbal): amzn.to/2EZAk1Y
Sony SLT-A55 DSLR (Link is for the A68) - amzn.to/2x81GOv
Neewer Backdrop Kit: amzn.to/2FVmw8Y
Neewer 176 Lights (x3): amzn.to/2xvSap5
Neewer Softboxes for 176 Lights: amzn.to/2YByT1g
GlideGear TMP-100 Teleprompter Unit: amzn.to/2JdJIRW
Apple iPad Air: amzn.to/2XnKiQV
Zoom H4n Handy Recorder: amzn.to/2K3TdBY
Boya BY-M1 Universal Lavalier Microphone - amzn.to/2Qml0QO
Manfrotto 190X Pro Tripod - amzn.to/2Nz4vCu
Adobe Creative Cloud Suite:
Photoshop CC 2018, Premiere Pro CC 2018, Audition CC 2018, After Effects CC 2018.
Buy the Suite: amzn.to/2G11oQj
Learn How to use them: amzn.to/2Nz4z5c
Credits:
Music: "Engine No. 9" by Les Hooper
© 1981 Birch Island Music Press, Sole Selling Agent: C.L. Barnhouse Co., Oskaloosa, IA
Used with Permission
Stock Footage from Storyblocks.com purchased under a yearly membership.
Keywords:
model railroad yard design,model railroad yard,model railroad yard layouts,model railroad yard operations,model railroad yard plans,model railroad yard track plans,model railroad,model railroad operations,model railroad planning,model railway,train yard,n scale,model train layout planning,model railroad small layouts,model railroad small track plans,train yards on small layouts,model railroad for beginners,model railroad layout design for beginners

Хобби

Опубликовано:

 

21 фев 2021

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 87   
@robertcummings7890
@robertcummings7890 26 дней назад
John, thank you so much, your videos have gave the direction for my next layout. My grandchildren will love the layout based on your insights. Again thank so much.
@pedrobrunodeandrade
@pedrobrunodeandrade 3 года назад
"This loop is not a loop." The best modelling tip I've heard this year, dude. Imagining the layout beyond the obvious circle. The possibilities are huge! :)
@dexterdog62
@dexterdog62 3 года назад
It’s so heartwarming to see a father son so engaged and having fun together operating the layout. Kids grow up so fast and time passes by so quickly. Cherish every moment and the memories that were created.
@dexterdog62
@dexterdog62 3 года назад
@John Hugh what are you talking about??
@JCsRiptrack
@JCsRiptrack 3 года назад
@dexterdog62 --It was a spam post. I'm setting up filters to get rid of them, but some of the bots get through.
@jhoodfysh
@jhoodfysh 2 года назад
Great video John. The part I liked best was the "high five" the smile on your son's face at the end.
@JCsRiptrack
@JCsRiptrack 2 года назад
Glad you enjoyed it
@1TruNub
@1TruNub Год назад
This series has been a major help to me. I am in the process of building my first layout. a railroad that is supposed to go between Galveston Texas and New Orleans Louisiana set in the 1920s. So this video in particular is helpful
@JCsRiptrack
@JCsRiptrack Год назад
Thanks! I'm glad you have found it useful!
@HallimarRathlornStudios
@HallimarRathlornStudios 3 года назад
It's good to see the series again.
@alfonsolanzagorta5138
@alfonsolanzagorta5138 2 года назад
This is the perfect solution for those kids who find trains boring!
@elleryparsons5766
@elleryparsons5766 3 года назад
Great Looking Table.
@googlypal
@googlypal 2 года назад
It’s so much fun to watch video after video while realizing how fast kids are growing.
@tcepilot
@tcepilot 5 месяцев назад
Where did you go? Your videos are second to none!
@JCsRiptrack
@JCsRiptrack 4 месяца назад
I’m still around, but I’ve not been able to record or post videos from home for the past while. I’m hoping that people are still able to make use of my library.
@keeganseva3975
@keeganseva3975 2 года назад
Thanks for sharing. This is a great series for people like myself who are new to the hobby. I cannot wait till you post layout updates of this one.
@americanindependantmedia9229
@americanindependantmedia9229 3 года назад
That was fun to watch.
@JCsRiptrack
@JCsRiptrack 3 года назад
Thanks. It was fun to do.
@alanandammakingnewmemories2950
@alanandammakingnewmemories2950 5 месяцев назад
Hi JC I was wondering if you have anymore vlogs coming out they were so good and very informative and have encouraged me to build one myself would love to have seen the finished job cheers from Australia Alan
@daveeberle1410
@daveeberle1410 7 месяцев назад
Thank you so much JC for providing such amazingly informative videos!
@joeyd4593
@joeyd4593 2 года назад
lifelong loop railroader, where were you 40 years ago lol :)
@labschi
@labschi 3 года назад
I just finished my first N gauge layout yesterday. The track plan follows your From Loop to Layout videos except for this last step. Instead of a port I've set up a container bridge, and the middle track is a coal mining complex. Thanks a lot for the great tips and hints! :)
@JCsRiptrack
@JCsRiptrack 3 года назад
That is awesome! Thanks for sharing Matthias!
@thatsimulatorguy
@thatsimulatorguy Год назад
Seriously needs more. Love this Series even if it’s old. And for your question, I do have a small layout yard and I use it for full layout operations
@cyrano234
@cyrano234 2 года назад
Not a modeler but interested in the layout design and operations side of things. Would love to see a video about the waybill system or other such systems that can be used.
@tomwcameron
@tomwcameron Год назад
yes pls Actual wording details on what is written on 2 or 3 typical cards would be great.
@kamala2111
@kamala2111 3 года назад
Great video, nice too see you and your son enjoying the hobby!
@mattarmstrong5637
@mattarmstrong5637 3 года назад
Awesome video John, your son made a very responsible engineer too!! Great fun!
@JCsRiptrack
@JCsRiptrack 3 года назад
You got that right! He had fun, but i had to do each job as a separate session.
@strangleholdoutdoors
@strangleholdoutdoors 3 года назад
Love the video!
@roberthubal6278
@roberthubal6278 Месяц назад
Did the railroad workers get lunch break? Union rules. Great video. Nice job on the layout.
@MrJohnB-qs6dp
@MrJohnB-qs6dp 2 года назад
Really enjoyed this series!!!👊🏻 I've learned a lot of things and hope I can grow and learn more about this Cool Hobby!! I think you have found your Engineer for your layout and you as the conductor!!🤩 Stay Safe & God Bless!!!!
@alanandammakingnewmemories2950
@alanandammakingnewmemories2950 6 месяцев назад
that was so good and helpful
@andrewpalm2103
@andrewpalm2103 3 года назад
I enjoyed watching your operating session and your approach to opening up the loop. My own little HO layout is based on the Inglenook Sidings Puzzle. It represents a very small industrial park or transfer facility in 1962. The dedicated engine lives at the end of the lead track, and cars arrive from an interchange at the end of the long siding (the bumper is replaced by a derail). Due to its small size, I use a switch list as the operating document. I also wrote a computer program to determine efficient switching schemes, and it generally does much better than I do just winging it. Thanks for sharing your layout and painting methods.
@kevinreed4027
@kevinreed4027 3 года назад
I am hoping you will be producing more of these videos soon.
@MrJohnB-qs6dp
@MrJohnB-qs6dp 2 года назад
Ok. I'm a little confused since I'm new at this. So let me see if I'm getting this right: You pick up cars to be delivered at rail yard, go 3x around track(clockwise), dropoff & pick up returns then go 3x around track counter clockwise. I'm guessing this is to show you are coming back to yard otherwise you would be heading farther away?? This is very interesting & exciting!! This is what I'm looking forward to do!!! Stay Safe & God Bless!!
@JCsRiptrack
@JCsRiptrack 2 года назад
Yes. The 3x laps creates an illusion of distance, and an opportunity to railfan. Honestly, it can be as many times as you like, but if you want to keep it consistent, just make sure you do the same number of laps going out as you do coming back. So I do 3 laps out and back, but you could do 10 out and back and it'd still work.
@MrJohnB-qs6dp
@MrJohnB-qs6dp 2 года назад
@@JCsRiptrack Thanks for the info much appreciated!!
@elleryparsons2433
@elleryparsons2433 Год назад
Love the Design Lively track plan.👍👍👍👍
@Maurice00PA
@Maurice00PA 3 года назад
Nice job. Good explanation on basic operations. I am impressed with the smooth operation you got from the Kato crossovers. They can be finicky. I have two yards on my layout. Each on one side of a loop. One side is staging and the other represents the Conrail yard where my prototype shortline would pickup interchange. I have two shelves off that to represent two of the branches of my prototype. Cheers, stay safe and model on!
@JCsRiptrack
@JCsRiptrack 3 года назад
They can be finicky. I have some GP9rm's that I need to adjust the wheels on as they're slightly out of gauge that get caught on the points from time to time.
@cyclewithsteve6202
@cyclewithsteve6202 Год назад
This was helpful in imagining what I might be able to do when I can finally reclaim one bedroom. Instead of a table I could do a series of 12” to 18” wide shelves. (If you were standing at the wall, think of something shaped like a capital “G”). It would even allow for different yards for each direction.
@cameron_krause
@cameron_krause 3 года назад
Awesome video John!
@danchapin7987
@danchapin7987 7 месяцев назад
Thank you John for helping me see a realistic path to getting back into the hobby. I have several decent locomotives, many cars of various types, and a dcc controller in boxes because I bit off way more than was realistic for me. I put it all in boxes and it has sat unused for too long. I now see I can get started with this layout and enjoy the switching operations without the pressure to detail the scenery. Would you be willing to share this track layout and the Kato track items needed to build your track layout?
@Spek1212
@Spek1212 Год назад
I am currently working on building a N scale layout that models a fictional BNSF mainline from Casper, Wyoming to Burns, Oregon, and eventually Seattle. My moddled portion is from Pinedale, Wyoming to Rexburg, Idaho. The layout is extremly small, being about 6 feet long at its longest point. I plan to include a yard at Rexburg that will be used as staging, but if I ever decide to change things up, it can be used for operations.
@astolatpere11
@astolatpere11 3 года назад
Fascinating!
@HumancityJunction
@HumancityJunction 3 года назад
We were just talking about this series recently. Good to see another episode coming out. No yard, I do not have the room if I want to do continuous running.
@KenN.OXN.805
@KenN.OXN.805 3 года назад
@Human[c]ity Junction @Heath You can see whether you have room to put switches on two corner modules that lead to an imaginary destination away from your t trak loop. Then connect a yard module when you have time to build.
@HumancityJunction
@HumancityJunction 3 года назад
@@KenN.OXN.805 I have been considering adding a siding that can me extended to a staging yard. I like the yard Kevin Brown created for his t-trak layout.
@KenN.OXN.805
@KenN.OXN.805 3 года назад
@@HumancityJunction do you have a link to Kevin Brown’s staging yard?
@HumancityJunction
@HumancityJunction 3 года назад
@@KenN.OXN.805 Absolutely, ru-vid.com/video/%D0%B2%D0%B8%D0%B4%D0%B5%D0%BE-lPcm0Np7MmQ.html
@HumancityJunction
@HumancityJunction 3 года назад
@@KenN.OXN.805 I posted the link, but I think the link is being blocked. If you email me I can send it to you.
@jerrysmith1929
@jerrysmith1929 3 года назад
Looks like a good time is being had by all. While not personally a big fan of Unitraack, I can see it's usefulness in getting trains running quickly for a son and beginner father project before father goes on to more challenging modeling.
@JCsRiptrack
@JCsRiptrack 3 года назад
That's primarily why I am using it. Quick set up, and play around with several configurations before settling in on something that works. The original version of the plan included a timesaver puzzle. After testing stuff out, the Inglenook ended up being a better (if simpler) choice.
@elleryparsons2433
@elleryparsons2433 Год назад
With My I Have a Line Going into the Center of the Table Then I Have 3 Buildings On Each side then I Have a Coaling Station on the Outside off the Main Line Looking Good and Productive .
@Browneye57
@Browneye57 Год назад
Awesome...and the kids love it. 'Basic' operation is confuzzling for this old timer. :) I didn't catch it - are you running DC or DCC control?
@druark2
@druark2 3 года назад
This is great. Thanks.
@JCsRiptrack
@JCsRiptrack 3 года назад
Glad you liked it, Dave! Thank you.
@cadecunningham2208
@cadecunningham2208 3 года назад
Can you do a video on wires such as soldering? Thanks.
@donaldshroyer8633
@donaldshroyer8633 3 года назад
Nice vid. I've been using a similar system with 2 big differences: 1) When a train departs a locale, it doesn't leave, it enters a tunnel and emerges from the other side with a new symbol and its own set of movements. 2) All of the "paperwork" is generated from a custom programed MS Access app as .PDFs displayed on laptop, tablet, or smartphone.
@ketchy9
@ketchy9 3 года назад
Great video! Really shows what can be done in a relatively small space w n scale. Just curious what is the size of you layout in its current state?
@IMRROcom
@IMRROcom 3 года назад
Would of had the 2 engines sitting on the A/D track waiting and then have the switcher put the train onto those 2 engines. Same with the other way have the switcher put the train on the A/D track and then the engines arrive at the train. Do the same thing for the returns. Switcher does the yard work your locals do nothing in the yard other than wait for the switcher especially pulling cars out of your yard body. Union Rules are Union Rules
@richardjayroe8922
@richardjayroe8922 3 года назад
I just started on my yard.
@SamBoards
@SamBoards 3 года назад
Love the videos I would like to see a interchange video because that’s what I want to do on my layout but don’t know how to
@dodo1opps
@dodo1opps 3 года назад
Good Video, John. Great to see your layout. But I'd loose the background music...
@MartinGallacher
@MartinGallacher 3 года назад
Great! What does the Mario(?) dude with the yellow hard hat do?
@roguedragondraksis9114
@roguedragondraksis9114 2 года назад
I guess I'm lucky enough to live by a short line railroad that literally does make a loop. The UCRY. Which I hope to model in lego
@elleryparsons5766
@elleryparsons5766 3 года назад
I Run An Ho layout it is L- Shape. I Have a Switch goin Into The Line And Going to the Main Line My N Scale is Still Working in Progress. More Track will be Done Eventually.Not Rushing It.
@MyFingerLakesRailwayLayout
@MyFingerLakesRailwayLayout 3 года назад
Man that layout turned out nice! Any plans for scenery? It would make a huge difference. Bet your son would enjoy that part too.
@JCsRiptrack
@JCsRiptrack 3 года назад
Hi Bill, eventually! Although I now have some more real-estate to use, so I am going to spread some of these elements around my new space. So yes, scenery will come. I may even start by doing some dioramas to show the process in a smaller space.
@DrDiff952
@DrDiff952 9 месяцев назад
I am building an inglenook switchyard in N scale
@brendynscholler4288
@brendynscholler4288 3 года назад
my yard is the main hub of my 4x8 ft CN layout and has a oil and freight house buiness
@JCsRiptrack
@JCsRiptrack 3 года назад
You'll see a lot of CN stuff on mine :)
@woodman5647
@woodman5647 Год назад
Is it possible to get your track plan. I would like to build it.
@Chris-ux1ij
@Chris-ux1ij 5 месяцев назад
Isn't there a mistake at 13:33 - a train arriving should go to the arrival/departure track first then get the switcher to take the train from the opposite end and feed it into the yard via the yard lead before the big loco can then go to the rip track or pick up some other train from the yard to depart? In other words, stopping a train on the main line and then running around would not be allowed?? (as it would foul the mainline, i.e. it would be unsafe + inefficient to stop a train on the main line)
@Fgr63
@Fgr63 3 года назад
Hi John, What are the Kato unitrack sets you use for this layout?
@denisebasile3813
@denisebasile3813 Год назад
Always wanted one just not sure how I just made a new layout it's two 4by 4 an a whole in middle it's a long one whole wall I have HO if you have any ideals let me know. A lot of engines are long
@michaelplumb298
@michaelplumb298 2 года назад
What is the dice roll that you mentioned at the end of this video
@JCsRiptrack
@JCsRiptrack 2 года назад
If you look at one of the other videos in the series: "The Puzzle of Switching Operations." I use a dice-roll mechanic as part of that video.
@LifeOfRiley2166
@LifeOfRiley2166 2 года назад
What dimensions would you use for an HO scale equivalent to your track plan?
@JCsRiptrack
@JCsRiptrack 2 года назад
In HO Scale this track plan would be roughly 5.5' by 14' - But you could easily push the width of it as an around-the walls kind of layout.
@Bighell01
@Bighell01 3 года назад
With a 40 years old history(stopped in the 80’s) I’m curious where you are goning to in modellrailroading.
@Bighell01
@Bighell01 3 года назад
Don’t see the loop “which isn’t a loop”. Will try to look it over and over. If I don’t find out I will report myself. Grtz from the Netherlands (Europe)
@JCsRiptrack
@JCsRiptrack 3 года назад
Are you looking for the earlier videos in the series?
@Niles442
@Niles442 2 года назад
Well Done - but kill the music. The music detracts from your demonstration.
Далее
Fast and Furious: New Zealand 🚗
00:29
Просмотров 8 млн
Каха заблудился в горах
00:57
Просмотров 1,3 млн
Installing the Rail Yard on My Model Railroad Part 1
18:11
Model Railroad Yards--Design for Operations
20:01
Просмотров 242 тыс.
3D Printing for Model Trains - A Game Changer?
14:30
Просмотров 21 тыс.
What I DON'T like about N Scale
5:37
Просмотров 133 тыс.
110: Building My AWESOME Rail Yard Beginning To End!
17:54
ВЫХЛОП НА ЯПОНЦА TWIN LOOP #shorts
0:52
Nika loves to eat chicken #cat #cats
0:17
Просмотров 48 млн