Here is the second film of the first Mountsorrel Railway passenger train that ran on 23/11/2013. The film shows the train crossing Swithland reservoir (viewed from the branch line). The train enters the loop at Swithland before running onto the branch line and over the level crossing. The train is then seen on its return journey from Nunckley Hill.
10 окт 2024