Remember lifting these heavy mothers and stringing them out for our kerb layer he picked them up and laid them on his own pity this tech wasn’t about then .
Butler Tarmac we now use a 360 digger/rubber duck with a grab attached so we can lay straight from the stack of kerbs we then don’t have to string out kerbs prior to laying. Are you in the uk