If you've ever wondered just how an air traffic control tower is built then our time lapse footage of the construction of Manchester's ATC tower will show you.
The new tower at Manchester Airport had 1,500 tonnes of concrete poured in just nine days as it sprang up from nothing to its full height.
The "cab" that forms the Visual Control Room sitting on top of the stalk was constructed on the ground next to it before Europe's biggest mobile crane had to be brought in to lift it delicately into place on the top of the tower.
Take a look at the nine day construction process in our two minute time lapse video.

Опубликовано:

 

11 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 7   
@champdishantDPK
@champdishantDPK 8 лет назад
Really Gr8...Need to implement in all type of Buildings
@MikeSmith-eh1xx
@MikeSmith-eh1xx 11 лет назад
Really cool! Thank you for sharing
@HeighTechTV
@HeighTechTV 11 лет назад
How long did it actually take though?
@DavidSwanson6576
@DavidSwanson6576 6 лет назад
HeighTechTV I realise this is 4 years late, but I actually worked with the big blue crane (TC2800) you see putting the top on, and it took us 5 days total to build the crane, do the lift then dismantle it after!!
@jamesevans938
@jamesevans938 4 года назад
According to NATS it took nine days to build the tower
@alemran4859
@alemran4859 Год назад
When are you taking on air traffic trainee on?!!!!
Далее
Heart of Heathrow: Inside the Control Tower
5:17
Просмотров 302 тыс.
To mahh too🫰🍅 #abirzkitchen #tomato
01:00
Просмотров 3,4 млн
Demolition of The Blue Boar, Bolton 2021
11:13
Просмотров 36 тыс.
Demolition starts on 1970s Oldham tower blocks
3:25
Просмотров 1,4 тыс.
NATS Digital Airport 360 Showcase
25:57
Просмотров 727