NEO Inc. Power Facility is the facility where it produces power for cities. During a manual startup, the reactor unexpectedly overloaded and detonated. After the detonation, a severe high-energy release was determined, and severe radiation levels were spreading around a huge range after the Detonation of The plasma Fusion reactor, that has overloaded after the Manual Startup.
Chapters And Episodes:
0:00 Reactor Startup Preparation
0:37 Ventilating Reactor Core Chamber
1:04 Pressurizing Reactor Core Chamber
1:28 Starting plasma resistors, activating power delivery, and preparing power lasers to prime.
2:27 Power Lasers Primed
2:36 Activating Power Lasers
3:00 Waiting to Switch The "Adjust Power Laser Input" Switch
3:40 Reactor Overloaded, Stabilisation Attempt
3:47 Reactor Stabilisation Failed, Reactor Overload
6:03 Reactor Strongly Overloaded, Detonation Imminent
7:13 Reactor Superstructure Destroyed, Reactor Detonation Imminent.
7:47 Reactor Explosion
27 июл 2024