The construction method was similar to Kumkang Kind which i work for nearly 10 years. Compare to conventional method which are using plywood, wood and nails, this method was really fast which is 3 to 4 times faster. As my experience, normally we manage to raise 4 level per month easily. And for an Apartment that have 10 level, it just take 1 year to complete it all from concrete to finishing (painting, installing windows, doors and tiles).
It is only for a few floors, residential though the aluminium otherwise zouldn't hold the load of all the floors while the concrete sets. Otherwise your building takes too long to comlplete. At least that's what I think. Very interesting, cool concept. Full concrete construction is great for soundproofing, fireproofing, durability etc. To optimise it just needs a good thermal insulation system that at the same time reuces the amount of concrete needed. You can of course just insulate the outside against the concrete but it would be nice. Maybe this is more cost and few advantages over foam polystyrene block concrete builds or is it? Maybr doorways and stairs are better and easier with aluminium concrete formwork? I would ike to see them compared.
Very great, quick , precision, and strength..very expensive cost..but labor wage in there very expensive, time is money..i think the end of calculation more efisien this method..
Дороговато выйдет такая алюминиевая опалубка. Это подойдёт для типового проекта массового строительства. У нас в России такие технологии не нужны, воровать на строительстве станет тяжело прорабам и всей начести, что кормяться этим. Только индивидуальный проект для честных застройщиков. Но тут круг замыкается )))
In the Netherlands there is a old lighthouse which was built this way. They had a small mould which they moved upwards after each pouring of a bit of concrete.
The actual problem is the electrical conduit for outlets, lights, switches not to mention the pipes for fresh, gray and black water that should be very very carefully planned and have several extra just in case because once the concrete is poured there is no way back and to run a cable or a pipe on the face of the wall just doesn't look good. I can see the cost savings. I have seen first hand a building being built with a very similar system and I use to work in the building after it was finished. It was a 3 story restaurant and they did it very fast when started. I have no idea how long the planning took.
Where are the insulation, plumbing, electric conduit, Airconditions, etc..? The external vibrator will not reach down the bottom of these tall walls!. Pouring concrete should be done on stages ( at least 2 ) . But the idea can be modified/ improved.
It's all nice and clean at the start. Wait tell you get dried concrete on them. But I like it alot. Save on your body. 1 out of 10 10 being the best it gets a 10.
Saw the power boxes, but where do the wires run? Plumbing? Put together, take apart, it most add to the overall bill. I think the foam block system would be better.
The advantage with this over polystyrene block concrete builds is that this can do the floor and underlying walls at the same time. Possibly also the door and window openings are way easier and better with this sort of Alulinium system compared to foam blocks. Maybe the extra cost doesn't isn't justified by the few days of time you may win with that as it only workds for few story residential buildings anyways. You can of course just run the pipes and pour the concrete over or grind the wiring in later but this is a thing with almost all kinds of construction isn't it?
It looks pretty easy, but i would have liked to see a real world example, where construction elements have difficult configuration tuat does not match with you standard formwork element dimensions, this building looks like it has heen made with the exact dimensions to match formwork dimensions, which we all know that it hardly ever found on sites
I think such a ("template house base") is not a bad idea! One year, the builder can make more houses with a template. Costs are thus optimal. I would like to order a template based on a finished concept! Single-storey, 3-room house 100 sqm, SABLON house! Could this be? EU-Hungary-Budapest.
Das ist kein Haus aus Aluminium sondern eine wiederverwendbare Giesform für ein Haus komplett aus Stahlbeton. Sind wahrscheinlich aufnahmen aus Japan, wo so ein Haus sicherlich größeren Erdbebenschutz bietet.
@@ivanshabalin2489 кретин гугли аренда опалубки и фанеры для опалубки, фанера с 10ок раз используется на различных объектах, есть как на стальных таки и на алюминиевых каркасах , по вылазят мамкины мажоры с дивана которые ничего тяжелее пениса не держали и протирают штаны в офисах и заявляют потом авторитетно
TheSaeed111111, чтобы “коммуникации” совместно с закладными “трубные каналы” благополучно перемололо щебнем, валящимся с трёхметровой высоты при отливке этажа целиком. Чтож, «рацуха» зачётная! Гениальность прям сквозит. Воистину оптимизаторский подход.
Looks nice but, it seems to take some time to put forms up and down ,then every pin then make sure everything is level and hole to be patch so.... at the end they will be like “oh we forgot to put in the water lines ..!!” Lol 😂. No thanks