Thanks for the video. So how deep are these wells vertically? I assume they extend horizontally for quite a distance. I have seen frac jobs on one small xmass tree but this is a huge outfit! 5 BOP stacks with 3 holding a xmass tree for the frac lines? Wirelines on all 5? Were the casings perforated in this video? I have a lot of questions. Why not just install xmas trees on the wellheads on all 5 without a BOP stack?
I’m 21 yo in Florida I’m interested on going out to Alaska, ND,SD or Texas for a season to do some hard labor work what’s the best way to find info on it? The only thing I see is people saying just go and sleep in a truck till you find work.
Colorado, Wyoming, New Mexico, Pennsylvania, West Virginia are also options. Indeed would be your best friend look up entry level oilfield jobs. Good luck
@@charlietaulbee4977 apply, apply, apply... Call the company's a few days after your app is put in and inquire about it. Shows them you want it. Where do you live at
@@justhangingout4370 louisiana but willing to travel fixing to get my H2S and my Safeland stuff I worked as a Helper for Tight line Production in Minden rebuilding oil Feild pipe Seperaters 1502 pipe 1-2 in plug valves Aka manifolds Gate valves ECT
Flowback doesn't actually do anything until all stages on the well(s) are completed. They don't do anything until the workover rig is on site and drilling the plugs out
@@tazhillleader don’t you need Flowback in case of a screen out or getting a ball back. In some cases to equalize wireline or even as a bleed off after stages?
@@JaysterJayster You do, generally though flowback is isolated from everything going on there until such time as they are needed, so they rig up, pressure test, and don't touch anything unless they need to flow back the well or relieve pressure somewhere, otherwise they just do general lease maintence until frac is complete.
@@tazhillleader @Jake Swick depending on the operations, immediately after (or before frac if there are problems with the well) a Coil Tubing Unit is on location. At that point of time Flowback is balls to the wall 24/7 manipulating their manifold and checking "frac" tanks. This is their calm before the storm.