Тёмный

PA Farmhouse Build: Moving Right Along *sound fixed* 

Ginger Acres
Подписаться 263
Просмотров 30
50% 1

In the four days leading up to a Christmas Day, the framing crew made tremendous progress on our house to include framing the entire second floor, the roof system and sheathing the roof and exterior of the home with the ZIP System. Some of the windows still need to be cut and the ZIP system requires taping, but for the most part the house is dried in. Windows and doors will be installed in the near future. In addition, the construction of our masonry fireplace will begin shortly and once that is complete and the porch is framed, the roof and siding can be completed.
I’m hoping for more progress this week leading up to the new year and looking forward to the completion of the house in early summer of 2021.
I hope everyone has a safe, happy and healthy New Year! Please follow along for more in 2021.
Thank you for watching and as always, enjoy!

Опубликовано:

 

18 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
Hay Wagon Restoration - Reassembly
18:41
Просмотров 4,1 тыс.
Raising Walls and Setting Timbers
9:54
Просмотров 51
Prank Orchestra
00:10
Просмотров 1,7 млн
For my passenger princess ❤️ #tiktok #elsarca
00:24
John Mearsheimer and Jeffrey Sachs | All-In Summit 2024
54:05
Standing Seam Metal Roof Install
14:03
Просмотров 93
The A-frame build - framing dormer and second floor!
9:59
The House Takes Shape: Poured Walls
10:02
Elegantly Modern in Concrete | CGFR House
10:43
Просмотров 2,7 тыс.
Sealing up the house: ZIP Tape and Updates
10:16
Electric and Cable Trenching: CAT 316 F
11:39
Rough Ducts and a Porch Floor
5:32
Просмотров 37
Prank Orchestra
00:10
Просмотров 1,7 млн