When the Panama Canal Authority (ACP) needed help transferring water from a nearby lake to test the new locks for the Panama Canal Expansion project, they called on Xylem.
This was a large water transfer project with a very tight deadline. To meet the time challenge, Xylem chartered five 747’s to transport Godwin Dri-Prime rental pumps and equipment from the USA to Panama.
Xylem engineered and installed a pumping system which included 15 Godwin CD400M Dri-Prime pumps. These pumps were used to move 1.7 billion gallons of water into the new shipping channel and lock system in just 22 days.
www.xylem.com/dewatering

Опубликовано:

 

13 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 4   
@TM-tw1py
@TM-tw1py День назад
What is the late fee is the rental pumps are not returned in time?
@HushE2AskolE
@HushE2AskolE 2 года назад
Can water pump 3000feet direct vertical hill side by 3inch pipe????
@TheWickedclowndw
@TheWickedclowndw 8 лет назад
Hey that was a fun job
@ajithkumar920
@ajithkumar920 5 лет назад
Greate
Далее
The Engineering Marvel called Panama Canal
14:39
Просмотров 10 млн
Мои нет в ЛАПКЕРАХ
00:11
Просмотров 297 тыс.
How Do You Steer a Drill Below The Earth?
14:53
Просмотров 4,2 млн
Мои нет в ЛАПКЕРАХ
00:11
Просмотров 297 тыс.