Тёмный
No video :(

Pedestrians worried over Katani-Mlolongo footbridge left hanging above the Nairobi Expressway 

Citizen TV Kenya
Подписаться 5 млн
Просмотров 12 тыс.
50% 1

Kenya National Highway Authority (KENHA) says the bridge is a temporary solution meant to safeguard pedestrians ahead of the official opening of the Nairobi Expressway.

Опубликовано:

 

5 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 29   
@brianmboya1728
@brianmboya1728 2 года назад
This is a joke. There should not be any excuse for leaving this bridge like this
@michaelkioko3861
@michaelkioko3861 2 года назад
This shows you how much value they place on Kenyans & their lives. This is negligence even if its a temporally solution
@natashaamanda6234
@natashaamanda6234 2 года назад
But why would they care if the government and the leaders don't care
@edu-pw7hu
@edu-pw7hu 2 года назад
the Chinese contract needs to be stopped through a court order and penalties applied,,.for this and other hazardous conditions on the highway..this are irreducible minimus on road safety construction. Secondly the head of kenha and the supervision engineer as well as the consultant must be shown the door, that's the only way to institute, professionalism in kenya 🇰🇪.
@briant5685
@briant5685 2 года назад
you should blame kenha not chinese,chiese are putting a bridge over their project the rest of the part is for kenha,hakuna cha bure
@edu-pw7hu
@edu-pw7hu 2 года назад
@@briant5685 what a shallow way of thinking 🤔
@briant5685
@briant5685 2 года назад
@@edu-pw7hu it's not being shallow, it's logic,kenha are the ones supposed to erect a footbridge at the old road not the chinese unless kenha pays them to do so, that's why the footbridge appears like that. You should know that the kenha bridges that were demolished to pave way for the expressway were fully re-constructed but that one is a new footbridge being erected by the chinese investors at their road using their own money ,uko kwingine kenha wajipange,that's the way it is.
@edu-pw7hu
@edu-pw7hu 2 года назад
@@briant5685 in a way I concur with you,,,. But at project inception and safety ,proposal ,there is no way any right thinking Kenyan can append a signature on that kind of design.even someone who is not a roads engineer.secondly even the half Bridge is poorly constructed, with part of it protruding to the main old mombasa Road instead of being supported over the storm drainage ..this is an accident waiting to happen and the probability is rather high
@silasmengo4830
@silasmengo4830 2 года назад
Pedestrians safety is equally paramount...let us not wait for fatalities for measures to be taken SAFETY FIRST !
@cyruskayo1483
@cyruskayo1483 2 года назад
That explains all about the owner of express way its an individual investment. But I wonder why our government can't do things the right way
@MrMaboboz
@MrMaboboz 2 года назад
Oh my God! Someone from KENHA needs to get fired here, wtf!?
@millieokoth3526
@millieokoth3526 2 года назад
We suffered soo much, waongeze vifukiziii, imagine walking from there to dinku
@maryalff1689
@maryalff1689 4 месяца назад
No zebra crossing?? Signs? Trafficlight?
@kennedyolang1175
@kennedyolang1175 2 года назад
Just don't understand the Logic behind this half bridge.
@blessedbrenda3624
@blessedbrenda3624 2 года назад
I use this Mombasa road everyday and to say the truth this is not helping at all shinda yao ni tusipitie hizi barabara zao mpya peke yake mahali wameacha ndiyo risk kabisa
@drewg6200
@drewg6200 2 года назад
I hope kenha are listening!!
@Dante_live254
@Dante_live254 2 года назад
I suppose this is temporarily
@johnmwendwa5924
@johnmwendwa5924 2 года назад
Its is an impunity of highest order to be mindless of the pedestrians' safety
@edu-pw7hu
@edu-pw7hu 2 года назад
It is and the Chinese contract needs to be stopped through a court order and penalties applied. Secondly the head of kenha and the supersonic engineer as well as the consultant must be shown the door, that's the only way to institute, professionalism in kenya 🇰🇪.
@jamesgathaiya6450
@jamesgathaiya6450 2 года назад
What kind of footbridge is this what purpose of building it corruption everywhere
@diddiousdesign2147
@diddiousdesign2147 2 года назад
That’s a very poor design!! Why do a half bridge 🤔
@afro96beat
@afro96beat 2 года назад
This is ridiculous
@mosesokwaro
@mosesokwaro 2 года назад
At 2.30...the most important point is made. We hope a correction will be made to this structure. For know it also looks like one of the new obstacles that will deliberately slowdown traffic on the original road.
@bANana-yf1qm
@bANana-yf1qm 2 года назад
Kenyan pedestrians don't use footbridges, that's y iko nusu.
@sultanmswahilitv4864
@sultanmswahilitv4864 2 года назад
Risky and unsafe.Kenha fanyeni kitu
Далее
Rais Ruto aongoza taifa kuomboleza wanafunzi 18
1:59
Просмотров 2,9 тыс.
НЕДОВОЛЬНА УСЛУГОЙ #shorts
00:27
Просмотров 20 тыс.
Friends
00:32
Просмотров 207 тыс.