Pilatus Flugzeugwerke AG organizes their internal logistics processes at the headquarters in Stans, Switzerland with the load train system Factory Train FT810. Until recently, most of the materials were delivered to the production sites with forklifts or electric vehicles. Because of the steady growth of Pilatus and the resulting increase in the internal transport of goods, the capacities were limited by the previous resources. A more productive and cost-effective solution was therefore sought. The accident risk was also to be minimised. Because of the increase in traffic on the company premises, the risk of accidents also increased.
The internationally active Swiss company group therefore decided to use the load train system Factory Train FT810 at its headquarters in Stans. In-house material transport is now clearly structured and regulated in terms of time and cost. With fixed routes, the materials are delivered precisely when and where they are required.
16 сен 2024