Hello friends. And you guessed it, today's topic: this is how to make a floor screed with a grid.
Consider a floor screed in stages:
1. 0:08 Room cleaning and primer.
2. 0:36 Damping tape. Mounted using silicone, liquid nails or sealant. The tape will help compensate for linear expansion and improve noise insulation.
3. 1:37 Preparatory layer under the net.
4. 3:22 Mounting the mesh.
5. 4:47 Installing beacons.
6. 7:46 Fill the screed using the vibrating rail.
7. 9:20 Trim the screed
8. 10:57 Compensation shrinking screed tile glue.
9. 11:40 Dismantling of lighthouses
10. 13:23 Smear and trim the grooves.
11. 15:39 Checking the geometry of the flooded screed. For verification, I use a 2.5 meter rule.
12. Care screed
_______________________________________________________________________________________________________
Vibrolath for floor screed - • Video
_______________________________________________________________________________________________________
Share my videos in social networks - reposts, comments, likes - best thanks to the author! Feedback is always pleasant, so it is not for nothing that I tried) 💪🎥
_______________________________________________________________________________________________________
Music:
/ channel
1 апр 2019