Тёмный

Preheater System And Important Parts (Kiln System Part 2)_ English version 

Parros Cement Techno
Подписаться 4,6 тыс.
Просмотров 8 тыс.
50% 1

Preheater System And Important Equipment Parts (Kiln System Part 2).
Several equipment part Preheater System in the combustion process in the Kiln System.
The Preheater System is a very important equipment in the clinker production process in the Kiln System, because the clinker production capacity is determined by the type and design of the Preheater System.
Preheater System is a tower that reaches higher than 70 m in height, wich consists of several cyclones, 4 to 6 cyclone levels.
What equipment affect the performance of the Preheater System?
Please watch this video to the end, so you can understand what we will explain in this video.
There are several important equipment that greatly affect the performance of the Preheater System, including: Cyclone Preheater, Calciner, Preheater ID Fan, Feeding System.
Music in this video:
Song title : Windows Rolled Down - The 126ers
Artis : The 126ers
Licensed : Attribution-free RU-vid Audio Collection
==========================================================
Song title : When It's Good, It's Great
Artis : The 126ers
Licensed : Attribution-free RU-vid Audio Collection
==========================================================
Song title : Wide Awake
Artis : The 126ers
Licensed : Attribution-free RU-vid Audio Collection
==========================================================
Song title : Summer Love
Artis : The 126ers
Licensed : Attribution-free RU-vid Audio Collection
==========================================================
Thank you for watching this video, to watch other videos on Parros Cement Techno channel, please visit the link below:
/ @parroscement2625
#CementManufacturingProcess
#CementTechnology

Опубликовано:

 

3 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 13   
@gosula.amaralingeswararao8698
@gosula.amaralingeswararao8698 2 года назад
Good information guru ji sir
@parroscement2625
@parroscement2625 2 года назад
Thank you for the comments, I hope this video is useful for you sir...🙏
@ahmedmohamed-mc3fv
@ahmedmohamed-mc3fv Год назад
Thanks for your efforts.
@parroscement2625
@parroscement2625 Год назад
Thank you for your attention, sir, hopefully it will add a little knowledge and be useful.
@gosula.amaralingeswararao8698
@gosula.amaralingeswararao8698 7 месяцев назад
Good information ji sir tq so much for giving this information
@nurmayacaturwidayanti3355
@nurmayacaturwidayanti3355 2 года назад
helo sir, thank you for good information. I want to ask, what is the standard efficiency of the suspension preheater??
@parroscement2625
@parroscement2625 2 года назад
Hello Nurmaya, the standard efficiency of the cyclone preheater is below 10%, meaning that the less dust particles that come out of the preheater system, the better.
@sitiastuti463
@sitiastuti463 Год назад
Helo sir, thank you for good information. I want to ask, how to calculate suspension preheater specifications?
@parroscement2625
@parroscement2625 Год назад
Hello Siti. Thank you for your attention. Sorry, are you still in college or already working in a cement factory? To calculate the preheater system specifications it is related to the design, and there are several designs of cyclone preheater, there are 4 cyclone levels, 5 cyclone levels and 6 cyclone levels, according to the clinker production capacity. Meanwhile, I am not in a position as a designer cement factory, but I am in a position to operate and how ton optimize the operation of a cement factory.
@nguyenquanganhvu
@nguyenquanganhvu 8 месяцев назад
Great Videos
@mechouakali5781
@mechouakali5781 11 месяцев назад
Thanks
@eduardodaquiljr9637
@eduardodaquiljr9637 Год назад
May I know how large or small the meal is entering in the pre-heater system?
@parroscement2625
@parroscement2625 Год назад
Material feed into the preheater system depends on the clinker production capacity. For a clinker production capacity of 8000 tonnes per day, the material fed to the preheater is around 550 tonnes per hour. And for a clinker production capacity of 11,000 tons per day, the material fed to the preheater is around 750 tons per hour.
Далее
小路飞嫁祸姐姐搞破坏 #路飞#海贼王
00:45
PERFECT PITCH FILTER.. (CR7 EDITION) 🙈😅
00:21
Учёные из Тринидад и Тобаго
00:23
Manufacturing of Portland Cement
10:05
Просмотров 52 тыс.
Kiln Operation
24:48
Просмотров 90 тыс.
小路飞嫁祸姐姐搞破坏 #路飞#海贼王
00:45