Preventive Maintenance Time Based 

Maximo Secrets
Подписаться 1,5 тыс.
Просмотров 2,6 тыс.
50% 1

Опубликовано:

 

20 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 3   
@craigkokay5363
@craigkokay5363 Год назад
You forgot to mention that when you run the Generate WO or the PMWOGENCronTask, it will use the Generate Ahead By + Lead. For example I have a lead=10 and generate ahead by = 5, therefore it will look 15 days before the estimated start date. I recommend not setting the Generate Ahead By because the padding can easily be varied using the Lead field.
@SudharsanR-x4r
@SudharsanR-x4r Год назад
Hey Team, This is a great video, kudos for such a detailed preview on the module. I would love to know something more on PPM and Job Plam (JP). If a JP of a version is associated to the PPM and it has been generating work orders, and then if the JP is updated to a newer version (making it ACTIVE). Will the PPM automatically associate itself with the JP of the latest ACTIVE version?
@MaximoSecrets
@MaximoSecrets 3 месяца назад
Yes, once the Job plan revision is made Active, it is the one applied with a PM. A Job Plan at PNDREV (Pending Revision) can not be applied to a work order.
Далее
Master PM
27:48
Просмотров 1,6 тыс.
Running With Bigger And Bigger Lunchlys
00:18
Просмотров 15 млн
Three Steps to Mastering Maintenance and Reliability
1:02:07
Rotating Assets
21:37
Просмотров 2,1 тыс.
Job Plans
40:22
Просмотров 1,9 тыс.
Calendar Preventive Maintenance Setup Reminders
41:40
Asset Templates
18:08
Просмотров 1,5 тыс.
Maximo 7.5 Basic Work Planning
6:49
Просмотров 53 тыс.
Meter-Based PM Records in Maximo
7:38
Просмотров 4 тыс.
Routes and Collections
17:49
Просмотров 880
Asset Relationships
12:49
Просмотров 1,1 тыс.
Running With Bigger And Bigger Lunchlys
00:18
Просмотров 15 млн