Great and wonderful Job, Carl Moss. Please, upload how to Update, Track, Fix a behind schedule, Monitor & Control Schedule in Primavera P6 using this same project in English Language. It will be highly appreciated. Thank you for imparting this knowledge.
Nice. request for 2 playlists, 1. Advanced tracking, monitoring & control in Primavera, 2. Baseline, cash flow from BOQ of other structures project except building like a highway, water supply, pipeline (whatever you have experience) with photos & explanation. But in English. kindly consider & upload ASAP.
Good day Sir, pwede ka ba gumawa ng primavera vlogs for Mechanical System naman related to HVAC, Plumbing and Fire Fighting from BOQ to P6. salamat po.
Idol tanong ko lang po papaano ka po natuto ng primavera ano po yung journey na tinahak nyo at ilang years po bago kayo naging expert. Salam idol mabuhay!
S curve in excel with delay duration also indicate in same s curve. (Planned.actual.cumaltve etc...in my early project colleagues done above mentioned s curve..but didn't teach.pls ready and release video
Dear Sir I had a problem in Primavera P6, the problem is Performance % Complete and Schedule % Complete, can not roll up to Project level, but it is already rolling up to WBS Level, and please note that I already assign materials on activities. Please anyone can give advice, to solve this problem, I use Ver. 19.12 and Ver. 21.12. Thanks
Yes because the schedule and percentage ℅ complete on the wbs level or EPS based on the cost. If your schedule is not assigned with the cost then it does not roll up.
Sir good day, yong sa part 6 nyo po, 2 mo ago na video, pag load ko po ng materials resource sa p6, yong value ng mga duration ko ay naging zero po lahat, paano po ba ito ma troubleshoot? Thank you so much posir.