Тёмный
No video :(

Prime Drilling - HDD technology 

PrimeDrilling
Подписаться 2,6 тыс.
Просмотров 205 тыс.
50% 1

Prime Drilling is a designer and manufacturer of top quality HDD rigs and HDD equipment. HDD stands for Horizontal Directional Drilling.Our companys motto is: "for your success!". Because a successful bore not only depends on good equipment but also on a good service and a good support. Total customer satisfaction is our main objective.The customer can also choose between pulling forces of 25 to 500 tons, torques between 18,000 and 150,000 Newton meters and power units from 130 to 960 kilo watts.Besides HDD-rigs we also offer all corresponding components and accessories like bentonite mixers, pumps, rods, reamers, location systems and everything else. We can supply everything our customer needs for a successful bore.Being an ISO-certified company, we only accept top quality components from our suppliers. All purchased parts are approved products and are available world-wide.Horizontal Directional drilling is an economical and environment friendly method for the installation of pipelines underneath rivers, roads, railway tracks, buildings and other obstacles. With this method you can install: sewer, freshwater, gas, oil and telecommunication pipelines without trenching. In the first step a pilot bore is made from the entry to the exit point.During the pilot bore a bentonite suspension is pumped through the nozzles of the drill head where it then hydraulically removes the cuttings from the bore hole. The steerable drill string, consisting of drill rods screwed together, is guided along the rated drill path via a drill head with a locating system behind it.The bentonite suspends the cuttings and transfers it back along the annular space between the drill rods and the bore hole to the surface at the entry point. There it is pumped to a recycler. From the recycler the regained bentonite fluid is brought back into the drill cycle.The locating system shows when the drill head has left its predefined drill path. In this case the drill head will be redirected back on course.In a second step the pilot bore hole is enlarged in diameter by pulling back a constantly rotating backreaming tool. New drill rods are continuously added during the process to extend the drill string.All backreaming tools are equipped with nozzles and cutters inserts in order to hydraulically and mechanically remove the immediately surrounding soil.Due to the geology a mixture consisting of water, bentonite and other additives such as polymers is used to remove the drill cuttings and to stabilise the bore hole while also reducing the friction force.In a third and last step the product pipe is pulled in.During the pull-in process, a swivel between the backreamer and the ensuing product pipe is installed in order to prevent a rotation of the product pipe.The product pipe has to enter the bore hole without exceeding its minimum bending radius. Therefore the front part of the pipe will be adjusted to the exit angle of the bore hole by lifting it before it goes into to the bore hole.The HDD-Technology can be used in soft and very hard geological formations.
It does not matter if the bore is executed in Siberia at -40 degrees Celsius or at +40 degrees Celsius in the Sahara dessert.

Опубликовано:

 

26 авг 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 15   
@tonytony-ql6li
@tonytony-ql6li 6 лет назад
What happen when the rod broken in mid drilling?
@SamuelGribley
@SamuelGribley 3 года назад
If you can dig it up and hook on you do otherwise you are screwed.
@nicpalichphotography1460
@nicpalichphotography1460 7 лет назад
Wowsers how did I get here. 😳
@user-ms1rc6ql5x
@user-ms1rc6ql5x 3 года назад
어스드릴을 저런용도로도 사용 가능하군요.. ㅋㅋ 파이프까지 묻는게 가능하네 ㅋㅋ
@keithrichards4513
@keithrichards4513 3 года назад
WoW!
@asadurrehman8430
@asadurrehman8430 3 года назад
How to turn into in 45° ??
@carlostena7179
@carlostena7179 3 года назад
You really don’t want to go over 20 degrees
@fhhgg8608
@fhhgg8608 3 года назад
Salut le prix
@suhascshekar6569
@suhascshekar6569 3 года назад
I don't understand why this is called horizontal drilling whereas its drilling in 45°
@rrrobotom52
@rrrobotom52 7 лет назад
Big problems of breaking rod
@md.amzadhossen2191
@md.amzadhossen2191 Год назад
আজকে আর কথা হবেনা একটু চাপের মধ্যে আছি
Далее
DW Horizontal Directional Drilling Safety
26:29
Просмотров 94 тыс.
Visser Smit Hanab HDD at Mongstad
15:18
Просмотров 268 тыс.
SPONGEBOB POWER-UPS IN BRAWL STARS!!!
08:35
Просмотров 17 млн
HDD Rigs
13:55
Просмотров 144 тыс.
Horizontal Directional Drilling
6:39
Просмотров 587 тыс.
Prime Drilling - Horizontalbohrtechnik
11:27
Просмотров 25 тыс.
Trenchless New Installation HDD Animation
3:35
Просмотров 1,8 тыс.
Ditch Witch Trenchless Equipment Safety
26:26
Просмотров 45 тыс.
HDD Rig M8x12 On Crawlers
4:57
Просмотров 2,2 млн
Pulling in a main sewer pipe ~ rioolbuis trekken
6:31