Тёмный

Puyo City Drinking Water's Optimization 

CBS Ingenieria
Подписаться 319
Просмотров 457
50% 1

CBS Ingeniería carried out the optimization of the existing potable water system in Puyo City, based on the actual information from the existing underground infrastructure, in the design of water pipe lines from the water treatment plants to the water storage tanks, generating sectors where pressure and flow are controlled, as well as automatic system of the entire water project.
Unlike a Water Master Plan in which almost everything is designed again, an optimization seeks to use all existing and build control structures and complement small sections of pipe that are necessary to achieve operation with minimal waste of water and the maximum benefit for the companies that operate drinking water.
But how to use the existing if most of the small cities are not keep records, plans, chalk and other vital information. This can only be achieved with Underground Infrastructure Engineering, SUE for its initials in English of Subsurfase Utility Engineering. Following the INEN 2873 standard.

Наука

Опубликовано:

 

23 окт 2018

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
Proyecto Hidroeléctrico El Laurel 1 Mw
3:00
Просмотров 2 тыс.
This or That 🛍️
00:52
Просмотров 7 млн
Rejilla Coanda Mira
1:49
Просмотров 3,2 тыс.
Malla Coanda
1:57
Просмотров 3,7 тыс.
DESASTRE, CASCADA SAN RAFAEL
5:23
Просмотров 49 тыс.
Coanda Screen in Puyo City Ecuador
0:41
Просмотров 7 тыс.
Proyecto Hidroelectrico DUE
4:01
Просмотров 2,3 тыс.
Eliminación de la dureza del agua
13:34
Просмотров 274 тыс.
Proyecto San Jose de Minas
2:21
Просмотров 1 тыс.
Demolición controlada hidroeléctrica El Laurel
1:31
Просмотров 108 тыс.
iPhone 15 Pro в реальной жизни
24:07
Просмотров 413 тыс.