Минимально, будет но намного меньше. Аудиенция на 80% англо-говорящая по статистике, в итоге нет смысла, тк рост канала именно из-за этого заторможен как показал анализ канала специалистами
Gotta spacer it possibly as one of the option to mount/use that one, otherwise, yes, another one is needed. I have some 1/4 aluminum sheeting right now, could make it but not sure on the costs, especially what it will run to ship it?
@@budnixon I'm not a fan of using a spacer on a front skid. I feel like it needs those broad flat sections against each other for support, otherwise it just punches the bolt & spacer through the metal. In can move the Coastal Offroad skid to my Q. It's the Pathy that's getting the 3"SFD.
@@budnixon I'm in no hurry. I'll be heading back from Medford to Seattle in November and if you're ever down by Roseburg or closer, I could come there to meet. I'm definitely thinking about a set of those MOLLE for myself (I'd probably just install on the driver's side of the Q & maybe the Pathy). I'm also thinking of a 2nd set as a gift for a friend. Maybe only 1 for me and 2 for him. How much lead time do you need on those MOLLE panels?
@@TheKPDX molles 7-10 days usually, and I’m not sure when I’ll put up next batch, still have last pair from previous batch, they are slow sell, hate to freeze up funds. I’m in Salem, could make a skid for ya when you are here on the spot if you want to stick around for couple of hours.
@@budnixon Okay, good info. I'll take that last pair of MOLLE's you have. I can just pick them up in November or if for some reason you're down Medford way or I'm up in Salem. I can pay for them in the interim - just no reason to pay for shipping if I'm not in a hurry and will be passing through.