Small Wind Systems Maintenance and repair workshop with Ian Woofenden and Victor Creazzi in October. Removal of AWP turbine from free-standing 170 foot tower by SEI students. Diagnosis of failed bush by Robert Preus. Balancing of blades and re-erection of turbine power head in 25 mph winds. Turbine has since been fitted with blades and tail and runs very smoothly.
21 сен 2024