Route 66 Spirit of America Museum, Oct 21 update 

Steven Brant
Подписаться 1,9 тыс.
Просмотров 19
50% 1

This update shows that some new ceiling lights have been installed although the full new suspended ceiling is not yet in place in every room. Also, the new gas and drainage lines have been installed in the back yard. There are some code violations regarding the emergency generator that need to be resolved. Not shown: the 85 inch flat screen TV has been ordered for installation in late November, and the floor installation person now has the flooring materials he needs on hand.