We took the north pass through Big Pine. The road was harsh for my rig setup because l have 295/65 R20 and l didn’t want to air down any lower than 45 psi. There are few areas with snow and erosion roads due to recent rains. It sure was a good 2.5 hours of bumpy ride there
North pass is in typical condition, South pass is slower going than usual as the lower section has not yet been graded but is possible as of April 2024.