Read more at innwind.eu/
After the first model tests of a floating wind turbine in a combined wind-wave basin in September 2014, INNWIND.EU-Task 4.2 has again tested a semi-submersible floating platform for the 10MW INNWIND wind turbine in the facility of Ecole Centrale de Nantes, LHEEA.
3 дек 2015