it would be cool if scr had bigger disruption events, for example engineering works at east berrily lasting 2-3 days so connect is diverted from stepford central to benton, through port benton and morganstown docks and terminate at the connect platforms at morganstown
Mabye they can do some alternate routes like Mgt to st helens bridge via benton and mgt to greenslade Connect can also start going on tramlink if possible or even go SV/SC/Beechley/Willowfield/SHB/Benton to greenslade/West Berrily
that would be cool but there are a few issues. 1. West Berrily got removed in 1.7 2. SCR are only doing the James Street extension and not expanding 3. The tramlink tracks are scenery only so no trains would operate on there
Yep Shows that SCR needs to do more tests so it prevents bugs. In 1.6 when the shuttle opened Airlink trains in p6 after leaving they went on the bridge and got to Morganstown docks then despawned
This happened to me as well but not on connect and not from Morgantown, it all began when I was driving back from Airport terminal 2 to Stepford Central on semi express route so I got to stop at Airport Parkway but the tracks instead to change it to the express air link route for airport terminal 2 to Stepford Central. So I didn't stop at Airport Parkway and that red bar thingy finally pop up and de spawned me when I was at Morgantown