Hi, Great job! What proportions of portland cement, sand, stone and water did you use to cover that pipe? What granulometry of sand and stone did you use? Thank you.
@@leemcdee9564 is the screed fibre necessary and if so and what depth of drypack. Ive seen some jobs require mesh when the dry pack exceeds 3 inches or so. Also, we always do a 4:1 mix sand to porland but use around 1/4 latex to water. Does this negate the need for fibre because we notice a big increase in top strength especially when using a low dose latex water mix.