In the video, the routine dam activities of flap gate opening for level regulation involve the careful adjustment of flap gates to control the flow of water, ensuring that the reservoir maintains its desired water level. This process is essential for managing water resources effectively and preventing overflow or drought conditions downstream.
Sediment sampling is another crucial task demonstrated in the video. It involves collecting samples of sediment from the reservoir bed or intake structure to analyze the composition and volume of sediment buildup. This information helps dam operators assess the sedimentation rate, plan for dredging or sediment removal, and monitor the overall health of the reservoir.
Lastly, the video likely demonstrates the process of cleaning the trash rack, which is a protective structure installed at the intake to prevent large debris from entering the dam infrastructure. Regular cleaning of the trash rack ensures unobstructed water flow and prevents damage to downstream equipment. This detailed routine maintenance ensures the efficient and safe operation of the dam system.
#DamMaintenance #WaterManagement #SedimentSampling #FlapGateOperation #TrashRackCleaning #Hydropower #InfrastructureMaintenance
13 апр 2024