Ready. Set. Go. I am off and running with building my new workshop shed. I'm gonna hammer some sticks in the ground. Screw some boards to those sticks and run with some string.
Follow me on FaceBook:
/ simplyeasydiy

Хобби

Опубликовано:

 

5 ноя 2021

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 83   
@jasonm887
@jasonm887 Год назад
Hey bud. I've been a contractor tor for over 20 years and was a trade teacher for years. I wish I had this video to show my students. You did an excellent job explaining and doing this layout. Good work brother! Thank you for this. I'm gonna share it with other instructors I know. I always put a saw kerf in the board so I can easily reset the string. That's really all I can add.
@simplyeasydiy
@simplyeasydiy Год назад
I appreciate the kind words. Always appreciate additional tips. They help out everyone.
@gives_bad_advice
@gives_bad_advice 11 месяцев назад
20 years used to seem like a long time. . .
@frankpatton3059
@frankpatton3059 6 месяцев назад
yes, much appreciated sir. great work explaining everything
@mattehltd4179
@mattehltd4179 Год назад
You have no idea how important this class is ... I am coming back with a pen & paper 📜... And yes redo my entire house ... Thank you a million for the details. . . love from Kenya
@simplyeasydiy
@simplyeasydiy Год назад
Love the enthusiasm!
@richardbates3170
@richardbates3170 Год назад
The best video on this topic. I'm about to start building a large deck on uneven ground and this has been an absolute lifesaver. Thanks (and hello from the UK).
@simplyeasydiy
@simplyeasydiy Год назад
Glad it was helpful!
@sergioclaure991
@sergioclaure991 Год назад
These are great videos Stan, helps me understand what batter boards are used for in construction for a building.
@simplyeasydiy
@simplyeasydiy Год назад
Glad to hear it!
@JackMantis36
@JackMantis36 6 месяцев назад
Thanks Stan, watching this a few days before starting my house build. Super simple to understand to give first time string liners a little confidence...keep on
@simplyeasydiy
@simplyeasydiy 6 месяцев назад
Great to hear! Good luck on your build.
@AM-dn4lk
@AM-dn4lk Год назад
This was an excellent tutorial. Thank you for sharing.
@simplyeasydiy
@simplyeasydiy Год назад
You're very welcome!
@jerryray808
@jerryray808 Год назад
excellent. and your chickens love you.
@GoandLove
@GoandLove 2 года назад
Incredibly helpful video, thank you!
@simplyeasydiy
@simplyeasydiy 2 года назад
Glad it helped.
@daveaway
@daveaway 7 месяцев назад
Thanks for taking the time to share this info.
@simplyeasydiy
@simplyeasydiy 7 месяцев назад
My pleasure!
@Ara-g
@Ara-g Год назад
Very useful
@tamerhamdy3308
@tamerhamdy3308 Год назад
wonderful
@LordoftheCats
@LordoftheCats Год назад
Good vid with lots of info. Just about to start my project, so this will help a lot. Thanks
@simplyeasydiy
@simplyeasydiy Год назад
Good luck!
@TheROMaNProject
@TheROMaNProject 10 месяцев назад
Nicely done!
@simplyeasydiy
@simplyeasydiy 10 месяцев назад
Thanks!
@johndillian1018
@johndillian1018 Год назад
I need to have some kids. I cant tell you how many times I could have used someone to hold the tape measure for me!!
@cooperray5957
@cooperray5957 Год назад
Thanks mate really nice
@simplyeasydiy
@simplyeasydiy Год назад
No problem 👍
@charlesdjones1
@charlesdjones1 Год назад
Ah yes, I miss the golden days of SportsCenter. Definitely looking into getting one of these for building a shop out back. Thanks!
@simplyeasydiy
@simplyeasydiy Год назад
As cool as the other side of the pillow. 🙃
@stinebiz
@stinebiz Год назад
Thanks
@kelkismati3409
@kelkismati3409 8 месяцев назад
It's a nice video for engineering students in Building. Keep it up to continue inflicting building skills to leaners
@simplyeasydiy
@simplyeasydiy 7 месяцев назад
Thanks a lot
@sunilpermaul9504
@sunilpermaul9504 Год назад
Thank you bro 🙏 your good
@simplyeasydiy
@simplyeasydiy Год назад
No problem
@barryroberts6470
@barryroberts6470 2 года назад
Very interesting that Stan you must have the patience of a saint to be getting those measurements spot on, if that was me i would be pulling my beard off by now. It would be the hair on my head but there isn't much left on it ha ha ha. Looking forward to the next instalment of the Workshop build. Stay Safe Mate and the rest of the S family, Barry (ENG)
@simplyeasydiy
@simplyeasydiy 2 года назад
Thank you Mr. Barry. It does take a certain amount of patience.
@barryroberts6470
@barryroberts6470 2 года назад
@@simplyeasydiy Who's Mr Barry? i thought we were friends, and my friends call me Barry without the Mr bit. ha ha ha. Barry (ENG)
@khaloq2016
@khaloq2016 Год назад
what a beautiful lovely family ☺
@simplyeasydiy
@simplyeasydiy Год назад
You are so kind
@carle5538
@carle5538 Год назад
Nice chickens.
@tommy-ij9nd
@tommy-ij9nd Год назад
Thanks so much for taking the time to produce this video….I found it very helpful as I’m about to start a greenhouse project. My one question is if one should fuss over the rebar pins being perfectly perpendicular? It seems that if they weren’t you could easily be adding or subtracting and extra 1/2 inch or so.
@simplyeasydiy
@simplyeasydiy Год назад
No, it is not an issue. Why would it not be an issue? Because you already know what your diagonal measurement should be and you are checking that measurement on multiple occasions. The pins are for visual reference. The tape measure has the final say.
@hortonsstuff6948
@hortonsstuff6948 5 месяцев назад
I'm using this method for my solar Foundation footers
@mbuguakevo4839
@mbuguakevo4839 Год назад
Nice job
@simplyeasydiy
@simplyeasydiy Год назад
Thanks!
@user-ym5ls5jb8q
@user-ym5ls5jb8q 10 месяцев назад
good work
@simplyeasydiy
@simplyeasydiy 9 месяцев назад
Thanks
@nathanclements749
@nathanclements749 Год назад
This is great on mostly level ground, but any tips for doing this on a more dramatic slope? It's not like I can just lay a tape out on the ground, because the slope of the ground would make my distance measurement inaccurate.
@simplyeasydiy
@simplyeasydiy Год назад
It's actually not different at all. Pier and beam systems are the preferred foundation on slopped ground. You see buildings with piers a foot tall on one side and 4 feet tall on the opposite side. Don't get distracted by how level or slopped the ground is. Only two things matter. Footer 12 inches below frost line and the top of each pier level.
@ruicastro8230
@ruicastro8230 Год назад
I really enjoy how you teach . Question: If I’m laying down a footing on a downhill slope. Is it the escavators job to take less dirt on the low point or remove more dirt on the high point or does he first level out the entire area before he digs out the footing ? God bless
@simplyeasydiy
@simplyeasydiy Год назад
I'm assuming you are talking about a continuous footer on a slope? If the grade cannot be leveled or it is cost prohibitive to level the site out then you would use "step footers". In that instance you take more from the high point and less from the low point until you get to your step. Then you start all over again. However, all of the footer must be the required depth called for by code in your area. I live in Florida and we always level the grade. Step footers are rarely used here.
@ruicastro8230
@ruicastro8230 Год назад
Gotcha. Yeah It’s only 100 sq meters 10x10 it shouldn’t be to costly . Thanks a mil bud
@Doomzdayxx
@Doomzdayxx Год назад
Stan, love these videos, thanks man. I was considering building a block shed in my back yard. The water table in my area is, I would say, definitely lower than yours, though I do get "low spot" puddles during heavy rains. My plan for a foundation was basically to have a 16 inch wide x 40 inch deep footer poured (I live in Ohio and the frost line is 32 inches). Would probably construct some sort of rebar skeleton within the footer. Does this sound like I'm on the right track in your opinion?
@simplyeasydiy
@simplyeasydiy Год назад
If your frost line is 32" then according to the code in my area the footer would need to be 44" deep. Code here is 12" below the frost line. You would need to verify if it is the same in your area. Rebar in footers are code as well. I have a video on footers that was posted just after this one. Check it out. Good Luck.
@jimdrechsel3611
@jimdrechsel3611 9 месяцев назад
If you had taller piers would start with a low string and do the same at a higher level? Do you have any suggestions for keeping out animals underneath a floor above the ground on piers? Great videos. Really helped a lot.
@simplyeasydiy
@simplyeasydiy 9 месяцев назад
If you wanted piers that were 4 blocks high instead of one like I did, you would just calculate the height of those four blocks with mortar lines and set your batter boards at that height. As far as keeping critters out from under the building use skirting of your choice. Always maintain airflow under the building. So don't fill the space under the floor with garbage and other nonsense. If you use a solid material like sheet metal instead of a lattice style skirting cut vents in the skirting every 8 feet or so.
@terrypownall8081
@terrypownall8081 9 месяцев назад
Great videos, I’m learning a lot before I start my backyard storage shed! One question I’ve got. If cinder blocks actually measure 7 1/2” wide why is it that your 2” X 10” (actually 9 1/2” wide”) sill plates match the width of your cinder blocks? They look like 2” X 8” boards. Is this a video induced illusion? Thanks. Terry
@simplyeasydiy
@simplyeasydiy 9 месяцев назад
Sill plates are pressure treated 2x8's. Floor and Rim joists are 2x10's
@user-up7du2sw1n
@user-up7du2sw1n 5 месяцев назад
More videos❤
@danbiehler1325
@danbiehler1325 Год назад
Just out of curiosity what brand of laser level are you using and have you been happy with it? I have an old school transit and was looking into one of these.
@simplyeasydiy
@simplyeasydiy Год назад
Huepar. I have not had an issues with it. Been on countless job sites over the years.
@BigRigRich
@BigRigRich Год назад
I need to buy a laser level. I’ll use it on about 4 or 5 projects and then it will not get used much after that. Any suggestion on what one you’d consider purchasing?
@simplyeasydiy
@simplyeasydiy Год назад
If you're talking about one like what I have in this video I wouldn't buy one if you only have a few projects to do. Their are other methods of leveling that are just as accurate without laying out several hundred dollars. Get a line level set and be done.
@daviddinkha2811
@daviddinkha2811 9 месяцев назад
Love the video. I'm building a she shed for the wife and this helps a lot. What is the name of that lazer level your using. I'm using string levels right now. Crossing my fingers my level lines are correct. I wanna invest in a lazer level, but they are so expensive.
@simplyeasydiy
@simplyeasydiy 9 месяцев назад
I don't remember the brand name off hand. It's been with me for awhile. I don't recommend spending the money for laser levels for the basic homeowner that may only use it a couple times at most. String bubble levels are fine for small projects like she sheds. Good luck and enjoy the build process.
@daviddinkha2811
@daviddinkha2811 9 месяцев назад
@@simplyeasydiy thank for taking the time and sharing that information. So yes I've been very successful so far with a string, line bubble and a 4' level
@hagan357
@hagan357 Год назад
What kind of pants are those?
@timjs1018
@timjs1018 11 месяцев назад
I have a question! Why couldnt you have just wrapped the string around the pins instead of attaching them to the board and adjusting the nails? Could have gotten them level with a helper and the same laser lever you used to level the boards, no? Great video, thank you
@simplyeasydiy
@simplyeasydiy 11 месяцев назад
If you watch the next video in the series that may answer your question.
@timjs1018
@timjs1018 11 месяцев назад
@simplyeasydiy I did end up watching them all and yeah, it was answered. 😄
@ACobra289
@ACobra289 Год назад
Can someone explain why he used 11 ft 11.25 in instead of 12'?
@rodrigoruiz976
@rodrigoruiz976 7 месяцев назад
I'm not sure I understood how you could garantee the strings were perpendicular.
@johnmoyer5515
@johnmoyer5515 6 месяцев назад
I've seen more projects messed up because of not using batter boards,
@ktthao5224
@ktthao5224 9 месяцев назад
Wouldn't it be easier to use a line level instead of that leveling machine?
@simplyeasydiy
@simplyeasydiy 9 месяцев назад
Do whatever works for you.
@rvrt1829
@rvrt1829 Год назад
How important is having your corner pin exactly level stright up and down? Does this not change the actual squareness of the string lines?
@simplyeasydiy
@simplyeasydiy Год назад
This is a good question. A lot of You tubers will tell you that every step in the construction process must be perfect. Everything must be "Plumb, square and true" at every step in order for it to be right. I think they do this in order to maintain a majestic quality to their content and the industry. In reality no wall is plumb and no corner is 90 degrees. In reality, every step, from laying out the foundation to doing the finishing work is a honing process. Every step should get you closer to a square building. The pins are not the end all, be all step for a square building. Should they be as straight and secure as possible? Yes. Will your building be something out of a Dr. Seuss book if they are a quarter bubble off plumb? No. If you are off a little here you can still bring it back in line when you set the piers and again when the sill plates go on. In fact you could be perfect here only to be off after you set the sill plates.
@rvrt1829
@rvrt1829 Год назад
@@simplyeasydiy Thank you for your reply and insight. I am and have been trying to set out a concrete pad for a shed over the last week. I stuffed up my string lines I thought I had them right but didn't go back and check all the measurements of the actual width and length. I moved my strings too much and thought I had it right due to the diagonal measurement being the same. Pegged in all my boxing yesterday only to realise it's 80mm larger on one end. So now I have to undo it all and set out again. It's been so frustrating.
@allangamet256
@allangamet256 8 месяцев назад
😂😂
@allangamet256
@allangamet256 8 месяцев назад
Hammer on my hand😂
@Beanthemx
@Beanthemx Год назад
Big hammer would’ve helped you
@simplyeasydiy
@simplyeasydiy Год назад
Couldn't find my big hammer. I didn't have a workshop.
Далее
3-4-5 Method
3:20
Просмотров 2,4 млн
Using String Like A Pro
18:48
Просмотров 5 млн
All About BATTER BOARDS & Foundation LAYOUT LINES
19:42
How to square a corner [3,4,5 method]
5:00
Просмотров 49 тыс.
Boxing !! 😂😂
0:11
Просмотров 14 млн
Just try to use a cool gadget 😍
0:33
Просмотров 43 млн
Подкожные Импланты 🤯
0:23
Просмотров 2,7 млн