Hi Matt, thanks for your videos-I’ve learned a lot. I was just wondering if it's possible for a surveyor to set up a peg according to the outermost edge of the foundation instead of the boundary, or do surveyors only set boundary pegs while the builder sets up all the profile stuffs?