Тёмный

Siemens S7 400 PLC Troubleshooting || PLC in STOP mode || How to restore PLC to RUN mode 

PLC Nerd
Подписаться 6 тыс.
Просмотров 38 тыс.
50% 1

At times Siemens S7-400 PLC switch to stop mode and despite several attempts such as switching the position of RUN/STOP or Cold/warm restart or reboot, the PLC still remains stuck in STOP mode. During STOP mode, your plant cannot operate thus resulting in production losses.
As a DCS/PLC engineer/technician, you must restore the PLC processing, i.e to get back to RUN mode.
As a SOP, You first need to download HW configuration, then the Logic and finally the network configuration.
In the video tutorial, these steps have been performed.

Опубликовано:

 

14 июл 2021

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 51   
@ammadussiraj5617
@ammadussiraj5617 3 года назад
Well explained. Thankx team
@abugaus9846
@abugaus9846 3 года назад
Valuable information and clear explained thank you sir
@nitoalbano8371
@nitoalbano8371 Год назад
Thank you for this video, you've cleared so much more than many books and internet pages on how to download hardware, logic and network (critical!).
@PLCNerd
@PLCNerd Год назад
Thanks for your feedback
@lakhindarrajak8105
@lakhindarrajak8105 Год назад
Very good video sir.
@opinisiddik5691
@opinisiddik5691 2 месяца назад
Thank you for you're video, actually i facing same problem and now it was fixed by download backup
@PLCNerd
@PLCNerd 2 месяца назад
Welcome
@katthine5339
@katthine5339 Год назад
Thank you
@dharmendraverma5267
@dharmendraverma5267 2 года назад
Good👍
@hosseinbarati320
@hosseinbarati320 Год назад
❤❤excellent
@PLCNerd
@PLCNerd Год назад
Thanks!
@moniruzzamanshohag
@moniruzzamanshohag 6 месяцев назад
Hello Sir, Is it possible? Auto stop the SIEMENS PLC CPU, when happen any critical alarming situation. S7-300 PLC CPU physical Switch position can be move automatically from RUN position to STOP position?
@suduik
@suduik Год назад
Hello there, I think I have same issue but with different setup. One of our redundancy 414 -H CPU has been replaced due to unable to run. We did memory reset after installing new CPU, and found the CP443 and new 414 CPU were stuck in STOP mode. I was checking the diagnostic buffer, and found CPU link up/ update by master aborted. Cause: Synchronization error in operating due to incorrect data. My question is: If I download the entire back up program and netpro config for this particular PLC, will it affect the master PLC that running properly? Will it change the netpro for other connection partner for master CPU? Thanks
@veereshh1824
@veereshh1824 9 месяцев назад
Dear sir Please let me know Once came PLC solo Mode it can come automatically run mode ? or we need to switch from stop to run mode? (PLC CPU 417)
@khalilkhalil6852
@khalilkhalil6852 11 месяцев назад
following power outage I have a s-400eb automaton fault in stop mode we checked the batteries, no anomalies What do you think is the cause of the defect? Sincerely
@myspace20
@myspace20 Год назад
My PLC also in same position. But my PLC has redundant module also and both are in stop mode. What is the procedure for downloadin
@erbalumkan369
@erbalumkan369 2 года назад
is the configuration not stored on the memory card of the plc? Could it not be restored by switching the MRES switch?
@PLCNerd
@PLCNerd 2 года назад
No. Not in the case of S7-400 PLC. In this S7-400 PLC, the program is stored in the RAM i.e requires continuous power supply. BTW MRES erase the program stored in memory.
@iqbalmehedi3423
@iqbalmehedi3423 2 года назад
Excellent video captured. Thank you Sir. I am facing some problem with my S-7 400 CPU, Sir can you help me please
@PLCNerd
@PLCNerd 2 года назад
The solution has been explained in the video. Didnt it solve the problem?
@iqbalmehedi3423
@iqbalmehedi3423 2 года назад
@@PLCNerd Sir problem solved by an Engr but procedure was different. I want to discuss with you personally. Sir please give me a chance.
@iqbalmehedi3423
@iqbalmehedi3423 2 года назад
@@PLCNerd Sir please give your email address
@iqbalmehedi3423
@iqbalmehedi3423 2 года назад
@@PLCNerd Sir please give your email address
@daviderhahon
@daviderhahon 2 года назад
@@iqbalmehedi3423 Give your own email address so UTAcademic will contact you.
@manishshinde6197
@manishshinde6197 2 года назад
In my case s7-400H plc not allowing to upload & download. Also try with mres switch but plc not reset what will i do ?
@PLCNerd
@PLCNerd 2 года назад
Turn the power supplies off. Remove the PLC CPU and then plug again. Turn the power supplies again. Now (if the communication media is ok) it will be able to download configurations from Engineering station/PG.
@binyassina1525
@binyassina1525 Год назад
I have problem : hardware configuration error for plc s 400 V4.10
@mohamedslimani4432
@mohamedslimani4432 Год назад
How to fix the REDF error led status.?
@wonderfulworld5134
@wonderfulworld5134 Год назад
Did you disconnect the power to the PLC? Reconnect and it may clear the error that causes STOP? To be able to re download the PLC ladder program again takes the expert with the programming computer and the same program. Maybe they changed something that caused this and the original program had to be re installed.
@PLCNerd
@PLCNerd Год назад
Yes. Disconnected but this issue get resolved only with complete configuration download.
@sidikging2988
@sidikging2988 2 года назад
is there any Siemens plc that still oke if got power cut? i mean the program not lost and no need to redownload. i found omron plc is good, no need to redownload after start up / or power cut
@PLCNerd
@PLCNerd 2 года назад
S7 - 300 and S7 1200 Program doesnt get washed even if power is cut off. In S7-400 PLC in this video, must have internal batteries working, to save program from erasing.
@sidikging2988
@sidikging2988 2 года назад
@@PLCNerd oh thank you, is s7-300 and s7-1200 have internal battery too?
@ZahidkhanJummal
@ZahidkhanJummal Год назад
​@@sidikging2988s7400 it has, 300 i think so no
@ajeetpal8985
@ajeetpal8985 2 года назад
Hi good video. My siemens cpu s7400 show battery2 indication. Whats is means plz tell me.
@PLCNerd
@PLCNerd 2 года назад
It means that Battery 2 needs to replaced. It has been discharged.
@zizikundimalucas7712
@zizikundimalucas7712 Год назад
Change the battery at position 2
@askilash7855
@askilash7855 2 года назад
Pls help me sir my company same use this software of siemens PCS 7
@cameronsheridan5997
@cameronsheridan5997 Год назад
Will this work in redundant CPUs?
@PLCNerd
@PLCNerd Год назад
Yes.
@angbuhayngofw3895
@angbuhayngofw3895 2 года назад
Hi Teacher i have also problem with the PLC S7-1200 the plc status is stop mode. How to resolve this problem teacher?
@PLCNerd
@PLCNerd 2 года назад
In TIA portal, go online and try to change the status of PLC from stop to run mode. Also try to redownload the project into the PLC. PLC in stop mode means either it has no program in it Or due to some error it has been switched to stop mode.
@industrialelectricalsekho8883
My siemens plc ET 200S PROBLEM, SUDDENLY POWER OFF THEN NO DATA SHOW IN HMI DISPLAY ONLY ****** SHOW, PLEASE GUIDE HOW RESTART PLC
@PLCNerd
@PLCNerd Год назад
Re download program to PLC CPU. Program may have been washed. Check HMI to PLC comm cable as well.
@askilash7855
@askilash7855 2 года назад
Sir I want learn siemens PCS 7 software and hardware how to work and check and use it software
@PLCNerd
@PLCNerd 2 года назад
Dear You can learn PCS7 from youtube videos and manuals on google. Paid courses are available as well such as on Udemy.
@sidikging2988
@sidikging2988 2 года назад
Thats mean we must have the back up programs
@PLCNerd
@PLCNerd 2 года назад
Exactly. And u must make sure Backup UPS and PLC internal batteries be okay.
@ZahidkhanJummal
@ZahidkhanJummal Год назад
Download and warm start is also solution right
@PLCNerd
@PLCNerd Год назад
Possibly. Depends on the scenario.
@ZahidkhanJummal
@ZahidkhanJummal Год назад
@@PLCNerd like what SCENARIO
Далее
PLC Troubleshooting 101:   Basic Tips and Tricks
7:28
Просмотров 77 тыс.
Советы на всё лето 4 @postworkllc
00:23
ELA NÃO ESPERAVA POR ISSO 🥶 ATTITUDE #shorts
00:20
PLC Troubleshooting steps | PLC Fault Diagnosis
8:58
Просмотров 4,9 тыс.
Rule #1 for Programming PLCs
33:00
Просмотров 43 тыс.
The Installation of S7-400 Modules in a Rack
7:49
Просмотров 2,4 тыс.
How to Wire a PLC Control Panel Like a Pro
9:06
Просмотров 88 тыс.
Siemens S7 300 CPU Status and LED Errors Explanation
3:54
S7300 and ET200 Hardware Configuration
9:25
Просмотров 6 тыс.