Back in September 2022, this 5000 m² industrial floor was the first in Germany to be reinforced with SigmaSlab®, a combination of Dramix® steel fibers and a CCL post-tensioning system. Today, ten months after the execution, the jointless and crackless floor is still in perfect condition.
Not only is SigmaSlab® highly cost- and time-efficient, it’s also a sustainable alternative to conventional construction methods, no matter the size of the project.
9 ноя 2023