Building a new data center, hospital, or industrial facility requires an intricate balance of trades, engineers, and installers. Working around the schedules of HVAC and electrical teams, BIM coordination, and making sure everything is installed in the correct sequence results in longer lead times for construction projects. Owners are looking for facilities to be built faster than ever which requires contractors to think outside the box to deliver projects on schedule.
There’s a solution that lets you begin construction of key mechanical services and compress the on-site construction schedule. Offsite fabrication will allow the contractors to receive assembled multi-trade racks that can be installed in hours instead of months.
Unistrut Midwest provides the following solutions and more to fulfill your needs:
- Lighter 2D Corridor or Riser Racks
- Heavier Flat Pipe Racks
- Heavier Volumetric Corridor or Riser Racks
- Structural Multi-Trade Racks
Learn more and contact us @ www.Unistrut.biz
#sikla #siklasiframo #modularconstruction #construction #piperacks #riserracks #equipmentskids #batteryplant #ducts #piping #weldedsteel #steel #modularracks #unistrut #design #engineering #prefabrication #multitraderack #pipesupports

Опубликовано:

 

28 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
Master Craftsmen  - Erecting Steel
9:59
Просмотров 91 тыс.
The Hidden Engineering of Landfills
17:04
Просмотров 4,2 млн
James May finally drives the Tesla Cybertruck
14:15
How 3 Phase Power works: why 3 phases?
14:41
Просмотров 1,1 млн
Construction Lifting Slabs New
8:43
Просмотров 91 тыс.
What is Prefabricated Construction? | ModSpace
7:23
Просмотров 99 тыс.