Catalyst Video Services documented the removal and installation of a cement silo at Walcon Marine in Portsmouth by Spirotech-SRD.
The video was shot on two time-lapse cameras, an HD video drone and DSLR. The final footage was converted to black and white and then tinted throughout.
21 фев 2017