Why border the room. Seems like way to many seems. And why caulk anything that should be welded. I've installed miles of that product I leave a gap just big enough for my battery operated liester groover to fit the gap and my inside and outside corners look the exact same size. That welding rod is very easy to work with. Anybody that is using caulk is doing it incorrect
Wow, given these perfect conditions and a week to install ten yards a subcontractor could make 200 dollars a week. And a union shop definitely couldn’t compete with that. Not to mention that he didn’t even put up any cap. What a joke
Why border the room. Seems like way to many seems. And why caulk anything that should be welded. I've installed miles of that product I leave a gap just big enough for my battery operated liester groover to fit the gap and my inside and outside corners look the exact same size. That welding rod is very easy to work with. Anybody that is using caulk is doing it incorrect