Funny how doing this in a warmer climate/area is so much more relaxed. In our cooler climate, when that heater go's up Your pressing/joining quick as hell lol. Here they are coming together before the heater is even 3/4 of the way out.
This type of joints are required for only places where slideing are required. Otherwise overlapping and jointed couplings with cement solvent is more economical and labor saving.
No it's not. Stop commenting on stuff you have no idea about. I have assembled hundreds of miles of poly pipe this same exact way to carry water, natural gas and crude oil. No glue will ever hold up to the pressure these pipes must undergo when we cleaned them out after assembly nor will they hold up to the heat and cold.
AH ha ha ha ha ha , I was gonna say the same , that's a fuckin ankle buster for sure if they slip with those sandals :) best invest in some Chippewas !
@tadrjbs do you mean the mm sign? Abbreviation for millimeter. A millimeter is a measure of length, a thousandth of a meter. 1 inch = 25.4 mm. 1mm = 0.039" So 1000mm = 39.37"