Тёмный

Stanchion base routing 

Sustainable Sailing
Подписаться 557
Просмотров 176
50% 1

More progress towards carbon-fibre stanchions with fully sealed decks.
Today we were using the router to round off the top edges of the FR4 stanchion bases. These will be epoxied onto the existing triangles that the the original stanchions were bolted to. A 26mm carbon-fibre tube will go through this FR4 and all the way through the deck into a hole filled with thickened epoxy. The stanchion tube will slide onto it.
Our Stanchion Design follows what we learned from @Tulasendlesssummer in @ • DIY CARBON FIBER STANCHIONS
Our free Sustainable Sailing book is at: sustainablesailing.codeberg.p...
If you would like to support us then we have memberships or donations on Ko-Fi! at ko-fi.com/sustainablesailing/ (apart from a small card processing % we get all your support which is much better value than Patreon).
Or visit our shop at sustainablesailing.teemill.com/ for great hoodies, t-shirts and bags.
We are refitting a 1977 Rival 38 for a Sustainable Sailing retirement starting in Summer 2025. When we bought Vida in August 2019 she was in a very tired and damp condition with all original equipment and fittings (much of it not working). We have removed all the gas, diesel and paraffin equipment, and are installing all-electric (motor, cooking etc). More detail on our blog at sustainablesailing.net/
Socials:
Faceboook: / sustainsailing
Mastodon: mas.to/@SustainableSailing
#boatrefit
#stanchions
#sailing
Music from Epidemic Sound

Опубликовано:

 

5 апр 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии