Removing items from a decommissioned nuclear power plant is no everyday job. This project with RWE Nuclear GmbH was no exception.
👉 Mammoet was assigned to remove two steam converters, each weighing around 155t, from the control area of the decommissioned nuclear power plant in Lingen, Germany.
📽️ Watch the video and see how the large components were rotated inside the confined facility and lowered to ground level for transport.
Read more about our services and solutions for the nuclear industry: mammoet.com/nuclear-power/
3 окт 2024