STOPLOG EXTRACTION WITH GANTRY CRANE IN DAM 

Kashmir Explorer
Подписаться 10 тыс.
Просмотров 41 тыс.
50% 1

The removal of stoplogs from a dam spillway by a gantry crane post-gate maintenance involves careful planning and execution. After ensuring safety measures are in place, the gantry crane is positioned near the spillway. Using appropriate lifting equipment, the crane lifts the stoplogs vertically, maintaining balance and stability. The stoplogs are then transported to a designated storage area for further handling. A post-operation inspection is conducted to ensure safety and integrity. Detailed documentation of the process is maintained for future reference.
1. #DamMaintenance
2. #GantryCrane
3. #StoplogRemoval
4. #Engineering
5. #Infrastructure
6. #WaterManagement
7. #SafetyFirst
8. #MaintenanceTips
9. #DamOperations
10. #EngineeringLife

Опубликовано:

 

7 апр 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 2   
@lizwilson5814
@lizwilson5814 2 месяца назад
Fascinating.I wondered what happened to all the debris.Thisis one process.
@Kashmir_explorer786
@Kashmir_explorer786 2 месяца назад
The removing of floating debris is carried out by flap gates installed at the top of the dam.
Далее
矢作ダム放流開始20131202
6:43
Obere Wasserschlosskammer
5:27
Просмотров 11 млн
high flow spillway and reservoir views
5:22
Guess why the Tractor Quit Working..
20:29
Просмотров 131 тыс.
Marvel of Engineering Dam Spillways
10:21
Просмотров 1,2 тыс.
O MOMENTO QUE A ÁGUA TRAZ TODA  PASTA DA BARRAGEM
12:40
FULL FLIGHT! Boeing Starliner CFT
16:48
Просмотров 3,9 тыс.
Trash cleaning works dam site
2:44
Просмотров 4,9 тыс.
Kubernetes 101 workshop - complete hands-on
3:56:03
Просмотров 1,6 млн