Where do you install the CT that works with the Sunsynk inverter.

Опубликовано:

 

29 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 12   
@lebogangshai9346
@lebogangshai9346 2 месяца назад
What a great video... Thanks 👍🏾
@VliengWieng
@VliengWieng 10 месяцев назад
Is this the new "Limit to home" setting on the sunsynk software?
@fattyco1
@fattyco1 Год назад
Very well explained Marius. Nothing like visuals to hammer home a concept.
@007pieta
@007pieta Год назад
Thank you very much. The value that you put into “ inverter power limiter “, will that prevent to much load going through inverter? If my essential load is 3000w and my not essential load requires 4000w, for a few minutes, ( inverter is 5000w) will it be controlled by inverter or will it damage inverter? Presuming the panels are producing more than 5000w.
@dama054
@dama054 Год назад
Hi can you use the sunsynk with a grid tied inverter off grid like the victron
@lungacourage1260
@lungacourage1260 4 месяца назад
Good Evening Sir. Is it possible to power the non critical loads using the battery during the night
@greenpro-greenproconsultin7420
@greenpro-greenproconsultin7420 4 месяца назад
No, the inverter only powers critical loads from the batteries.
@KenIronside
@KenIronside Год назад
Hi Marius, thanks for this, it's useful. Can you explain what the 'Priority Battery' vs 'Priority Load' setting does? Thanks
@jarredtyson6550
@jarredtyson6550 10 месяцев назад
Priority load selected should send PV production to AC load first before it sends to battery ( load requirement must be satisfied first before battery can receive PV power)
@beefycuts2100
@beefycuts2100 Год назад
This will not be applicable when the whole house load is running on Essential.
@greenpro-greenproconsultin7420
Correct. In that case you will probably not activate push back (Not tick "Zero export"), and the CT is ignored in any case.
@beefycuts2100
@beefycuts2100 Год назад
Thank you, I just want to verify something, I run my home off a 16kw SS, everything essential, I do not export to sell, but I have a pp meter, and without the ct connected and a 20w grid trickle, the pp meter go into error mode. Everything works 100% now with the ct connected and 20w grid trickle.
Далее
SunSynk CT too far from Inverter
7:29
Просмотров 18 тыс.
SunSynk Work Modes Setup
15:40
Просмотров 67 тыс.
Inside Out 2: BABY JOY VS SHIN SONIC 4
00:16
Просмотров 4,3 млн
Sun Synk
10:49
Просмотров 56 тыс.
Full Sunsynk training course
7:02
Просмотров 22 тыс.
Beware Team Retard Solar Electricians
6:16
PSSC LT CT meters U31B
6:27
Просмотров 94 тыс.
Understanding CT coils and battery settings #Sunsynk
5:26
Inside Out 2: BABY JOY VS SHIN SONIC 4
00:16
Просмотров 4,3 млн