Just like a floor moving off the starting line. Makes sense. Not only that but some manufacturers don’t require cove stick behind it. Which will make everything shift based on the pressure you use as well.
Anyone who thinks this tool is not the way to do it does not care about quality. Grant it-as an hourly installer I am paid to do quality above all else.
If you need x tra hands on heatweld, lvt, base, vct , treads let me know.. We r getting slow till mid January... Our main jobs are schools.... Military base, govt(small).. We have small repairs here and there
Great job. Blessings and Love in Jesus Christ Holy name 🙏. John.3:16 in the Bible says for God, so love the world that he gave his only begotten son, that whoever believes in him shall not perish, but have everlasting life, for God, sent not his son into the world to condemn the world, but the save the world through him
We done over 100 treads and risers as one piece, cove sticks between them ,in 2 weeks At new elementary school stairs Used rubber tiles glue on treads, contact cement can on risers. No double face tapes... Tugged riser to the nose to made smooth Between nose and risers. Used only 25 ft measurements tape, frame square, 10 ft straight.. paint brushes..