Telecom Installation include the layout first the criteria is very simple to understand,first of all a field telecom engineer will check the layout plan & verify the antenna height ,azimuth , existing technologies & guide his team mates that during installation you need to verify the following data at the tower top . Red handwriting indicates that new technologies will be proposed as per layout plan , Dotted red line indicates the jumper wires connection with RRU and RF Antenna . Cascading fibers also need to check from layout plan & fiber must be installed from end to end .As a field telecom engineer your responsibility is to guide your team mates during this activity.
#Telecom Installer
#Telecom Layout
#RFlayoutplan.
Subscribe to Telecommunication Training Portals and stay up to date with our latest videos
We do not intend to reduce any views from the original content but my aim is to educate people through my technical videos .
Copyright Disclaimer : Copyright Disclaimer Under Section 107 of the Copyright Act 1976, allowance is made for "fair use" for purposes such as criticism, comment, news reporting, teaching, scholarship, and research. Fair use is a use permitted by copyright statute that might otherwise be infringing. Non-profit, educational or personal use tips the balance in favour of fair use.
4 авг 2024