Toledo Bend Dam & Spillway on March 10, 2016 after record flooding. The nine floodgates were open at 22 foot each and the powerhouse had one generator operating. Spillway output was a record 198,144 cu. ft. per second which is 1,486,080 gallons per second. The lake level was also at a all time record of 174.36 MSL. Filmed in high resolution with a DJI Phantom 2 vision quadcopter (drone).
10 мар 2016