Two tower cranes are erected over a weekend for the new Marriott Headquarters building in Bethesda, Maryland.
This video shows the erection of the mast of the south tower crane on Saturday morning, and the erection of the jib of the north tower crane on Sunday morning.
Produced by John Z Wetmore, producer of "Perils For Pedestrians".

Опубликовано:

 

3 авг 2019

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 18   
@David-cv1vh
@David-cv1vh Месяц назад
Great
@joenewman6939
@joenewman6939 4 года назад
My hat goes out to you guys great job crane operator persition my friend
@alistairmacrae4870
@alistairmacrae4870 Год назад
Not wishing to be a spoil sport, the guys with the hammers, if one of these hammers were to drop? The crane driver is something to behold.
@miguelainaga7658
@miguelainaga7658 10 месяцев назад
Todos mis respetos para esas personas,yo jamas me subiria a esas alturas
@flick22601
@flick22601 4 года назад
I've seen thousands of these cranes in my life but, this is the first time I've seen how they're erected. How large is the concrete base and how long must it cure before they assemble the crane? Thanks for posting.
@JohnZWetmore
@JohnZWetmore 4 года назад
I don't know the exact dimensions, but it is a pretty massive slab several feet thick. There is a photo in this blog post that shows the four mounting points for the north tower protruding from the middle of the slab. (Click on the photo for a larger version.) pedestrianadvocate.blogspot.com/2019/08/construction-in-bethesda-tower-cranes.html
@JohnZWetmore
@JohnZWetmore 4 года назад
On another site they were pouring the foundation today (Wednesday) for a tower crane that will be erected Saturday. So they only needed a few days for the concrete to cure, even though it might take a bit longer to reach full strength.
@bertferri-5685
@bertferri-5685 Год назад
Huge respect to these riggers. I get vertigo on a step stool reaching for the cereal box on the top shelf!😊
@philcollins2289
@philcollins2289 11 месяцев назад
rien de compliqué 👏🇨🇵🖐️
@AM-dn4lk
@AM-dn4lk 10 месяцев назад
So how did they assemble the other crane which lifted the components for this crane?
@JohnZWetmore
@JohnZWetmore 8 месяцев назад
They use a "small" crane to assemble the big crane, which assembles the tower crane. The rigging crew starts very early in the morning.
@user-oc8pf2hf4z
@user-oc8pf2hf4z Год назад
ก่อสร้างไรครับ
@lrmuanpuia9929
@lrmuanpuia9929 9 месяцев назад
Fulll sport😮😮
@gerardochacon1743
@gerardochacon1743 Год назад
Kiero montar una torre grua autoestable de espamex j 47 ns
@user-ph8ge7fy3b
@user-ph8ge7fy3b 4 месяца назад
👏👏👏👍👍
@Ifantoys
@Ifantoys 9 месяцев назад
Sungguh sangat luarbiasa...,dan saya merasa hormat kepada para pekerjanya yang sangat pandai sekali,salam dari Indonesia 🇮🇩🇮🇩🙏🙏
@marcneville42
@marcneville42 8 месяцев назад
Los trabajadores: a sus cojones estan muy grande.
Далее
Assembling a Tower Crane - Part 1 (of 2)
43:11
Просмотров 754 тыс.
Grue à tour RAIMONDI MRT 234
17:41
Просмотров 147 тыс.
How Tower Cranes Build Themselves
10:50
Просмотров 7 млн
Marriott HQ Demolition (Part 1)
45:19
Просмотров 12 тыс.
Dismantling the World's Largest Tower Crane
12:15
Просмотров 3,5 млн
Oberkranmontage eines AK190.8 - Part 1 - Gegenausleger
12:51
ALPA 535 Herndon Demolition (Part 5)
1:43:44
Просмотров 907