Тёмный

Track Talk 2 - Mainly about soldered construction 

The 2mm Scale Association
Подписаться 559
Просмотров 907
50% 1

These five videos are the edited recordings of the April (2021) Zoom Meetings of The Fencehouses Group in which we discussed our personal experiences and differing approaches to 2FS track-building. They are not detailed sets of instructions and we do not intend them to be seen as prescriptive, but hope they might give some ideas to those newly coming over to the dark side and also be of interest to established 2-Millers.
(Detailed instructions and advice about the different methods of track construction in 2FS can be found on the 2MM website, in the supporting documents available with products from the 2MMSA shops, and articles in the 2MM Magazine.)
The talks are personal reviews and the discussions wide-ranging so it is impossible to list all the topics discussed in each video. However, the main themes are:
Track Talk 1 - Mainly about the Easitrac System (43')
Track Talk 2 - Mainly about soldered construction (45')
Track Talk 3 - Mainly about laying out, and combined "plastic" & soldered pointwork (28')
Track Talk 4 - Mainly about switches, crossings and point construction (52')
Track Talk 5 - Mainly about alignment (+ simple inset track) (45')

Хобби

Опубликовано:

 

3 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии    
Далее
Сколько стоит ПП?
00:57
Просмотров 217 тыс.
Провал со стеклянным хлебом…
00:41
Tutorials on Templot: 1 - Introductions (58mins)
57:56
Просмотров 3,5 тыс.
Drws y Nant
5:43
Просмотров 585
These Keys Shouldn't Exist | Nostalgia Nerd
19:32
Просмотров 682 тыс.
2mm Scale Association Open Day 2024
27:12
Просмотров 2,2 тыс.
Cars left over from Ramazan. #ey_ramazan
0:15
Просмотров 6 млн
ТАМОЖНЯ БЕЛАРУСИ
0:19
Просмотров 6 млн
30 сентября 2024 г.
0:29
Просмотров 1,2 млн