Download the full presentation from this LinkedIn post www.linkedin.com/posts/baher-elsheikh-6687a63b_tube-to-tubesheet-joints-baher-activity-6975127575127896064-IhCm?
Hi, you did a fine job, very clear and a lot of informations in the same place. By the way, the link for download is not working..could you please add another one ? Thank you
Hello, do you know the standard of tube-to-tubesheet pull-out force test,I didn't find this part in ISO15614-8, my English is not very good, thank you very much.
In TEMA there is no explanations for such requirements, but from some manufacturers and technical literatures, they where able to achieve the proper pull axial force by following this criteria. while for smaller grooves, much lower pull force was required
@@baherelsheikh4942 how can I calculate design strength in UW-20.2 to ensure that equal or greater than axial tube strength. When UW-20.3 Nomenclature said F d = design strength, but not greater than Ft
@@baherelsheikh4942 Thanks Sir but I wanted to know about any theoretical books/study material that can help in clearing concepts related to design and fabrication of heat exchangers and aboveground storage tanks