Upper Tamakoshi Hydropower I Latest Updates I Largest Power-Producing Hydropower Project In Nepal 

EngiTruth
Подписаться 829
Просмотров 12 тыс.
50% 1

In his video provides a concise overview of the Upper Tamakoshi Hydroelectric Project in Nepal. With a power capacity of 456 MW, it is the largest hydroelectric project in the country and has been operational since July 2021. Situated on the Tamakoshi River, a tributary of the Sapt Koshi River near the Nepal-Tibet border, this project holds significant national importance. At full capacity, it can generate power equivalent to two-thirds of Nepal's current power generation. Notably, the project was financed entirely by domestic financial institutions and companies. Watch this video to learn more about this impressive hydroelectric Project.
Prepared By:- Mr. Sasishekhar Thapa

Опубликовано:

 

12 сен 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 21   
@sujanshakya5810
@sujanshakya5810 Год назад
update on budhi gandaki hydropower as well sir🙋‍♂️
@nabinacharya5459
@nabinacharya5459 Год назад
Dherai ramro badda😌
@EngiTruth
@EngiTruth Год назад
Thank you 🥰
@kisney6329
@kisney6329 Год назад
Nice sir ❤
@civilholic
@civilholic Год назад
nice sir keep it up
@EngiTruth
@EngiTruth Год назад
Thank you sir
@biveksharma4015
@biveksharma4015 Год назад
Aba 10barsa ma chai loan tire sakcha ke
@kiranbhandari9409
@kiranbhandari9409 Год назад
Wonderful video sir
@EngiTruth
@EngiTruth Год назад
Thank you sir
@Sports-only-one
@Sports-only-one 7 месяцев назад
Thanks for information
@pratimakarki3624
@pratimakarki3624 Год назад
Wow sir ❤❤
@ashutosh.yadav1
@ashutosh.yadav1 Год назад
Sikta irrigation project ko update pani garnuhos hai sir
@neerajprj9161
@neerajprj9161 8 месяцев назад
storage project le matra ho sir seasonal demand fulfill grne, Upper tamakoshi PROR project le daily peak demand in morning and evening lai address grxa in dry season.
@EngiTruth
@EngiTruth 8 месяцев назад
yes .
@Kamalthapa0005
@Kamalthapa0005 Год назад
wow
@aasthalamichhane2687
@aasthalamichhane2687 3 месяца назад
What is intake pipe type? And gravel trap dimension?
@EngiTruth
@EngiTruth 3 месяца назад
a penstock that directs water from the reservoir or river to the turbines is intake pipe. Like: Open Channel Intake: Inclined Intake: etc. structure designed to capture and remove coarse sediments, such as gravel, sand, and silt, from the water before it enters the penstock or turbines is Gravel Trapper. But Dimensions depend on several factors, including the flow rate of the water, the size and type of sediment to be trapped, and the specific design and operational requirements of the hydropower plant. Thank you.
@hemlalkhanal17
@hemlalkhanal17 Год назад
यसले बोनस पनि दिँदैन त? यसको सेयर किन्नु गलती भयो कि क्या हो ?
@prasamshashrestha201
@prasamshashrestha201 8 месяцев назад
Yesle bunus didaina hai maile kineko xu aba khattam vayo jasto x 😢
@ubsena2645
@ubsena2645 8 месяцев назад
I am also reading engineering in class 10 but sadly I have to leave in after 10 😢😢
@Plastic_Surgery_Pokhara
@Plastic_Surgery_Pokhara 11 месяцев назад
Wrong info. Upper tamakoshi is the biggest scam of nepal. Kati murkha banaucha
Далее
Новый уровень твоей сосиски
00:33
Upper Tamakoshi Hydropower Project (456 MW)
7:11
Просмотров 4,4 тыс.
Powerhouse||Upper Tamakoshi Hydropower Plant 456MW
9:33
TSHO ROLPA TREK | ROLWALING VALLEY | 4580M | GCAP | 4K
1:11:33