VFD I/O CONFIGURATION DETAILS | DI, DO, AI, AO CONFIGURATION | HOW TO CHECK POWER | CONTROL WIRING 

electric Nmore
Подписаться 4,6 тыс.
Просмотров 1 тыс.
50% 1

Опубликовано:

 

22 окт 2024

Поделиться:

Ссылка:

Скачать:

Готовим ссылку...

Добавить в:

Мой плейлист
Посмотреть позже
Комментарии : 13   
@maniraj4595
@maniraj4595 3 года назад
Vera level anna
@tamilselvan8784
@tamilselvan8784 3 года назад
Super bro well
@vickytwentythree
@vickytwentythree 3 года назад
U working in powerplant??
@electricnmore3398
@electricnmore3398 3 года назад
Yes
@vickytwentythree
@vickytwentythree 3 года назад
Sir need Alternator protection please??
@electricnmore3398
@electricnmore3398 3 года назад
Ok
@prakashksp2918
@prakashksp2918 3 года назад
Transformer oil name: Naphatnenic based oil flash point high or low? Paraffinic based oil flash point high or low?
@prakashksp2918
@prakashksp2918 3 года назад
Intha profile kku match job unga company la vacancy irukka please help me sir Diploma in Electrical and Electronics Engineer(DEEE) Electrical "C" License Competency Certificate,TNLB With six Year experience I have Been Working in the Utility Maintenance of substation & Operation maintenance at Lucas tvs under Voltech engineering My roles and responsibilities are 33kv/11kv(5800kva).and 11kv/433v (1000kva) transformer Operation and Maintenance. * 380v/11kv(1250kva) 1.2Mwp Solar step up transformer Operation and Maintenance * 33kv sf6s,11kv vcb,415vAcb&ocb switchgears Operation and Maintenance * Operation and Maintenance of 1000 KVA Captacitive Diesel Generator sets * 1000kw Inverter operation and maintenance * 5800kva Demand control, Day ? to - day Electrical Breakdown attend and Preventive Maintenance * Installation of 11KV / 433 Volts, 1000 KVA, Transformers in LTVS, Padi. * Installation and commissioning of Lighting system in shop floor & Peripherals and utility equipments like Compressor, Pumps and Cooling towers. * winding test and continuity testing * Monitoring electrical parameter of the solar plant * Pump and Blower maintenance. * Earth bit maintenance and checking earth pit resistance value * Energy saving activities implementation saved 1500Kwh Energy per day. * All types of relay testing like Voltage Relay, Current Relay, Earth Relay
@farukpatel3049
@farukpatel3049 2 года назад
explanation good but im from gujrat so launguge not undastand
@prakashksp2918
@prakashksp2918 3 года назад
Dear sir: 1.under voltage realy (uv) Uv voltage value-Voltage%-tripping milli second 2.over voltage realy (ov) Uv voltage value-Voltage%-tripping milli second 3.over current realy (oc) Oc current value-current%-tripping milli second 1.IDMT realy ( inverse definite minimum time) Oc current value-current%-tripping milli second 2. Instantaneous realy Oc current value-current%-tripping milli second 3. definite Time realy Oc current value-current%-tripping milli second 4.Earth fault realy ( E/F) Fault current value-current%-tripping milli second 1.Ref realy ( Restricted earth fault) Fault current value-current%-tripping milli second 2.Sef realy ( sensitive earth fault) Fault current value-current%-tripping milli second 5. Differential realy Different current value-current%-tripping milli second 6.buchholz realy (Buc) Minimum pressure valve alarm- Maximum pressure valve trip 7.pressor realise value (Prv) Minimum pressure valve alarm- Maximum pressure valve trip 8.Winding temperature (Wti? Minimum temp alarm- maximum temp trip 9.oil temperature (Oti) Minimum temp alarm- maximum temp trip 10. Magnetic oil Gage (Mog)
@electricnmore3398
@electricnmore3398 3 года назад
1) 1.under voltage realy (uv) Uv voltage value-Voltage%-tripping milli second 0.9 times, 1 to 3 sec 2.over voltage realy (ov) OV voltage value-Voltage%-tripping milli second 1.1times, 1to2sec 3.over current realy (oc) Oc current value-current%-tripping milli second 1.IDMT realy ( inverse definite minimum time) Oc current value-current%-tripping milli second 1.1times, 150msec 2. Instantaneous realy Oc current value-current%-tripping milli second 1.5 to 3 times, 100mSec 3. definite Time realy Oc current value-current%-tripping milli second 1.5 times, 200mSec 4.Earth fault realy ( E/F) Fault current value-current%-tripping milli second 1.Ref realy ( Restricted earth fault) Fault current value-current%-tripping milli second 0.1times, 50 to 100mSec 2.Sef realy ( sensitive earth fault) Fault current value-current%-tripping milli second 0.1 to 0.15times, 50 to 100 mSec 5. Differential realy Different current value-current%-tripping milli second 0.05times, 50mSec 6.buchholz realy (Buc) Minimum pressure valve alarm- Maximum pressure valve trip see my video for transformer protection 7.pressor realise value (Prv) Minimum pressure valve alarm- Maximum pressure valve trip see my video for transformer protection 8.Winding temperature (Wti? Minimum temp alarm- maximum temp trip 80 alarm, 95 trip 9.oil temperature (Oti) Minimum temp alarm- maximum temp trip 90 alarm, 110 trip 10. Magnetic oil Gage (Mog) mog for only alram circuit this all are approximate value defend up on the application may be changed
Далее
ABB ACH580 HVAC Drive Basic I/O Connections
5:01
Просмотров 10 тыс.
Как не носить с собой вещи
00:31
impossible lungs test !! 🫁
01:00
Просмотров 4,4 млн
ABB ACS560 connection and Parameter Setting
8:55
Просмотров 93 тыс.
What is the Difference between VFD and Soft Starter?
7:30
ABB ACS550 2 WIRE PROGRAMING
9:19
Просмотров 66 тыс.
Как не носить с собой вещи
00:31