same as vibro stone column compaction difference only the fill material aggregates ranges 1"-3", it is a methodology of soil improvement . I handle soil improvement different methods in Dammam Port when i was in AECOM
how to install vibrators connected to pipe and connecting to hook crane ? did vibrators must lift with crane or enough lay down vibrators at ground and then add pipe at top position?