Cedar Fair needs to check its collective ego. They throw far too much shade at too many companies when they’ve asked almost every manufacturer to push the limits of what they can do, then pretends it’s all on said manufacturer.
I feel like they took advantage of RMC and intamin because they know they were the only company that would push the limits then gave both of them the cold shoulder after
I know they might not have worked with them in a while, but it doesn't mean they're throwing shade. They're looking for the best ride for the time, within their budget. They're trying out different companies. Currently Zamperla is on trial
I'd love to see gravity group and rmc create a project together for king's Island. Gravity Group could build the structure. While RMC takes care of the tracks and carts.
@@donaldplatfoot1203 I am sure that doesn't matter much as I-Box is very similar to wooden track in dimensions if not the same. The only thing that would matter is the track gauge.