A drive on the Northern Beltway between Salem Parkway and US 52.
The drive begins on South Main Street in Kernersville where I enter Salem Parkway West/US 421 North. Upon reaching the beltway, I take NC 74 West heading northbound. I reach the end of the beltway and merge onto US 52 North. After a short drive on US 52 North, I make a u-turn and head back on US 52 South. Returning to the beltway interchange, I take the temporary link to NC 74 East and then exit at University Parkway. The recording ends after a short drive on University Parkway.
The link to the beltway between US 52 and University Parkway -- the original terminus -- opened in late Nov. 2023. The link is temporary until construction on the beltway mainline between University Parkway and US 52 is finished. Once the work is completed, the travel lanes will be shifted to their new and permanent alignment.
The beltway is currently signed as NC 74. A separate project will complete the beltway between Salem Parkway and Interstate 74 southeast of Winston-Salem. Once that is done, the beltway will be re-signed as Interstate 74.
Recorded in Dec. 2023 in Ultra HD resolution using a GoPro Hero10 Black camera.
15 сен 2024