Coasters… One of the best creations in the amusement industry
This channel is all about them! From UK coasters to those of Europe. This channel is full of coasters. As a UK enthusiast you will mainly find vlogs from British theme parks such as Thorpe Park, Alton towers or Blackpool Pleasure Beach. THE SMILER #1 Goals: 100 subs - ✅ 200 subs - ✅ 500 subs - 1000 subs -
Imagine its a f**king nightmare to sort out if it doesn't make it through the s-turn. But if it makes it with water filled dummies, just tipped over the edge, it won't be a problem with humans and sent over rhe lift hill at pace.
The addition of water dummies weighing approx 200 lb each will slow it down. Normal operating weight will be lower and it will run faster. Testing with very heavy trains is routine for safety.
Test runs usually are slow at first. It will get faster & faster once its warmed up & not just on the actual coaster itself but the lift hill too. Look at Saw The Rides first test run for example. It was slow as anything going up that 100ft lift then when it crested it made its way around, a little slow & squeaky at some points, but nonetheless made it around & after several test runs, it was flying around & soaring up the lifthill now.
It’s only going to get faster over time, as more tests are conducted. That chain lift seems to have been running extremely slowly during the first test earlier
The first element was taken suiiper fast that will def have ejector. The rest of the course will speed up but even if it didnt, those would be the best stalls ever built. Mannn that pooks like heaven just dangling up there. A little faster through the low to the ground elements at the end will be great for all the whip
Its slow because it went up the lifthill little by little once it goes up the lifthill at normal speed you're gonna see the difference of the speed on the layout.